DESCRIPTION:
DRAWING NO:
3 of 6
INSTALLATION NOTES
SHEET:
164201373---1
NOTES:
*
= These neutral bolt mountings are only available on SSBMs or
SSBMs with SMBs rated as 3P/4W.
A---4
Powerware 9315 Parallel Capacity/Redundant System with PHP SSBM
164201373 Rev. A
092402
Table C. Power Cable Termination Requirements
Powerware 9315 SSBM Model: 2500 and 3000
Terminal Function
Terminal
Function
Number of Cable
Connections per Bus
Tightening
Torque
N-M (lb-ft)
Bolt/Int.
Hex Size
(In.)
AC Input from UPS
SS
E8
Phase A
14 --- 2 bolt mounting
76 (56)
1/2
p
Output to SSBM
E9
Phase B
14 --- 2 bolt mounting
76 (56)
1/2
E10
Phase C 14 --- 2 bolt mounting
76 (56)
1/2
E4
Neutral
24 --- 2 bolt mounting
76 (56)
1/2
Frame
Ground
Ground
24 --- 1 bolt mounting
76 (56)
1/2
AC Input to SSBM
E1
Phase A
12 --- 2 bolt mounting
76 (56)
1/2
p
Bypass
E2
Phase B
12 --- 2 bolt mounting
76 (56)
1/2
E3
Phase C 12 --- 2 bolt mounting
76 (56)
1/2
E4
*
Neutral
24 --- 2 bolt mounting
76 (56)
1/2
Frame
Ground
Ground
28 --- 1 bolt mounting
76 (56)
1/2
AC Input to
S
E11
Phase A
14 --- 2 bolt mounting
76 (56)
1/2
p
optional SMB
Bypass
E12
Phase B
14 --- 2 bolt mounting
76 (56)
1/2
Bypass
(Separate Feed)
E13
Phase C 14 --- 2 bolt mounting
76 (56)
1/2
(Separate Feed)
E4
*
Neutral
24 --- 2 bolt mounting
76 (56)
1/2
Frame
Ground
Ground
24 --- 1 bolt mounting
76 (56)
1/2
AC Output from
SS
E5 (E15)
Phase A
12 (14) --- 2 bolt mounting
76 (56)
1/2
p
SSBM or Optional
SMB to Critical
E6 (E16)
Phase B
12 (14) --- 2 bolt mounting
76 (56)
1/2
SMB to Critical
Load
E7 (E17)
Phase C 12 (14) --- 2 bolt mounting
76 (56)
1/2
Load
E4
*
Neutral
24 (24) --- 2 bolt mounting
76 (56)
1/2
Frame
Ground
Ground
20 (24) --- 1 bolt mounting
76 (56)
1/2
AC Output from
SS
∅
A
Phase A
12 --- 2 bolt mounting
76 (56)
1/2
p
SSBM to Load
Bank
∅
B
Phase B
12 --- 2 bolt mounting
76 (56)
1/2
Bank
∅
C
Phase C 12 --- 2 bolt mounting
76 (56)
1/2
E4
*
Neutral
24 --- 2 bolt mounting
76 (56)
1/2
Frame
Ground
Ground
28 --- 1 bolt mounting
76 (56)
1/2
Summary of Contents for 9315s
Page 205: ... 5HY ...