7--8
Powerware 9315 Parallel Capacity/Redundant System with PHP SSBM
164201373 Rev. A
092402
UPM1
UPM2
UPM3
UPM4
SS
FBP
CBP
CBS
BYPASS
INPUT
BATT
UPM
INPUT
BATT
BATT
BATT
SSBM
Path of Electrical Power
(open)
LBB
TABS
TO TEMPORARY LOAD
BANK (BY OTHERS)
TEMP.
OUTPUT TO
CRITICAL LOAD
Figure 7---4. Path of Current Through the Parallel Capacity/Redundant System
in Load Bank Mode with SSBM with Temporary Load Bank Tabs.
Summary of Contents for 9315s
Page 205: ... 5HY ...