A---29
Powerware BPIV (10 kVA--30 kVA) Installation and Operation
164201406 Rev. C 013004
DESCRIPTION:
DATE:
DRAWING NO:
SHEET:
REVISION:
C
OPTIONS CABINET SCHEMATICS
1 of 18
013004
UPS SYSTEM OPTIONS CABINET CONFIGURATIONS
POWERWARE BPIV (10 kVA---15 kVA)
WITH ISOLATION TRANSFORMERS
B
A
C
A
B
DISTRIBUTION
42 CIRCUIT
CABINET
I/O
SW1
N
X2
H21
H2
1
H2
X0
H21
X2
X3
H22
XFMR
H3
C
H13
6
H23
MAIN ISO
H31
B
BYPASS
X1
5
2
CB3
CB2
H32
A
ISO XFMR
H31
2
H33
C
1
3
1
BREAKER
X1
INPUT
C
5
BYPASS
B
A
5
H3
H1
6
IN
6
BYPASS
INTER--
IN
4
2
GND
OUTPUT
B1
H22
4
BREAKER
H11
L1
B2
CB1
3
3
BREAKER
BYPASS
1
L2
MAINS
EXT. WRAP
2
X3
H11
L3
70A
1
70A
7
N
1
H33
AC LOADS
H23
5
H12
9
H13
CABINET
11
WIRING
H1
12
X0
H12
4
8
70A
3
4
2
H32
C
B
A
A
OPTIONAL
OPTIONAL
OUT
C
B
UPS
CABINET
(208V, 600V
480V
OPTIONAL)
MAINS IN
(208V, 600V
480V
OPTIONAL)
BYPASS IN
AC LOAD OUT
BYPASS SWITCH; WITHOUT DISTRIBUTION
BYPASS SWITCH; WITHOUT DISTRIBUTION
SINGLE FEED; INPUT TRANSFORMER;
BYPASS SWITCH; WITH DISTRIBUTION
DUAL FEED; DUAL INPUT TRANSFORMERS;
SINGLE FEED; INPUT TRANSFORMER;
BYPASS SWITCH; WITH DISTRIBUTION
DUAL FEED; DUAL INPUT TRANSFORMERS;
CONFIGURATION
CONFIGURATION
CONFIGURATION
CONFIGURATION
164201406---7
GND
GND
GND
N
NEUTRAL TO
GND BOND
GND BLK
4--POLE
P/O TB1
N
N
GND BLK
GND
4--POLE
E1
E2
E3
E6
E7
E8
E12
E12
E9
E10
E11
P/O = PART OF
208/120V
P/O TB1
P/O TB1
P/O TB1
P/O TB1
P/O TB1
Summary of Contents for BPIV
Page 1: ...www powerware com BPIV INSTALLATION OPERATION MANUAL UPS 10 15 kVA 20 30 kVA...
Page 263: ......
Page 264: ...164201406 Rev C 164201406C...