2--23
Powerware BPIV (10 kVA--30 kVA) Installation and Operation
164201406 Rev. C 013004
2.4
Options Cabinet Installation
2.4.1
Unloading the Options Cabinet from the Pallet
To remove the Options cabinet from the pallet, refer to paragraph 2.2.1 for Options
cabinet without Distribution Housing or paragraph 2.2.2 for Options cabinet with
Distribution Housing.
2.4.2
Joining the Options Cabinet to the UPS Cabinet
To join the Options cabinets to the UPS, perform the following steps. Refer to
Figure 2---11 for non-permanent installation or Figure 2---12 for permanent
installation of the Powerware BPIV (10 kVA---15 kVA) UPS and Figure 2---13 for
non-permanent installation or Figure 2---14 for permanent installation of the
Powerware BPIV (25 kVA---30 kVA) UPS.
NOTE:
The cables used in step 8 are coiled outside the Options cabinet and are
attached at the factory to the input and output terminals of the Options
cabinet.
1.
Roll the Options cabinet to a spot near the left side of the UPS.
2.
Remove left front solid panel, and right front vented panel from the Powerware
BPIV (10 kVA---15 kVA) UPS cabinet or left front solid panel and front vented
panels from Powerware BPIV (20 kVA---30 kVA) UPS cabinet. Front panels are
secured with magnetic latches and are removed by pulling panels straight
forward to disengage magnetic latches (see Figure 2---1 or 2---5).
3.
Remove screws securing UPS cabinet internal safety shield panel and remove
panel to gain access to wireway.
4.
Remove front vented panel from Options cabinet. The front panel is secured
with magnetic latches and are removed by pulling panels straight forward to
disengage magnetic latches.
5.
Remove left side outside panel from UPS cabinet. Retain hardware.
6.
Remove left side panel from Options cabinet. Retain hardware.
7.
Install side panel removed from the Options cabinet to the left side of the UPS
cabinet. Secure with screws removed from UPS cabinet.
8.
Route the input and output cables from the Options cabinet through cutout in
UPS cabinet side to the UPS wireway.
9.
Push the Options cabinet against the left side of the UPS cabinet.
10.
If permanently mounting the system, proceed to step 16; otherwise, proceed to
step 11.
11.
Secure the Options cabinet in position by lowering the leveling feet, until
cabinet is not resting on the casters and the cabinet is level.
12.
Secure the front of Options cabinet to the front of the UPS cabinet by sliding
the angle grounding/mounting bracket, from installation kit, behind the base of
the Options and UPS cabinets with the bottom angle facing outward (see
Figure 2---11 or 2---13). Use hardware provided in the kit to secure the bracket.
Summary of Contents for BPIV
Page 1: ...www powerware com BPIV INSTALLATION OPERATION MANUAL UPS 10 15 kVA 20 30 kVA...
Page 263: ......
Page 264: ...164201406 Rev C 164201406C...