To prepare
the
PDM
for
to the UPS:
1.
Roll the UPS into its final operating position and secure it
its leveling feet.
2. Roll the PDM cabinet to the left of the UPS. Join the two cabinets using the
appropriate method described in “Joining Cabinets” on page 11.
Open the door of the
cabinet. Remove the top and bottom deadfronts.
Set the deadfronts and screws aside for remounting later.
4. Use three bolts and three nuts from the hardware joining to secure the front
of the transformer cabinet to the front of the UPS cabinet at the points shown in
Figure 25 on page
(See ‘Joining an Optional Cabinet to the UPS” on page
22.)
Attach a ground bus between the frames of the UPS and PDM cabinet, using
the procedure on page 26.
6.
Secure the PDM cabinet with its front leveling feet
To
the
cabinet to the
UPS:
1.
Cables for interconnecting the
to the UPS are coiled and tie-wrapped in
place inside the PDM cabinet The connections inside the transformer cabinet
are already made. Locate the coil of cables inside the PDM cabinet.
2. Cut the tie-wraps around
me
cables, and uncoil the cables. Each cable is
marked with its designation point in the UPS cabinet.
3. Connect the cables according to input
as shown in in Table C:
Table C. PDM to UPS Connection
in
made)
point in UPS
Distribution
(2 cables)
(2 cables)
(2 cables)
Distribution Panel (2 cables) N
El2
Distribution
(2 cables) G
Customer ground
4 4
Plus UPS
Manual
Summary of Contents for Plus 80
Page 1: ...0 Powerware Plus 80 Unintemqtibk Power Supply Operation 164200252 Rev A...
Page 55: ...a 1 a Pe WNP U N I N T E R R U P T I B L E P O W E R S Y S T E M S I i b I EXlDE ELECTRONICS...
Page 88: ...I I I I I I IO I I I I b I I NOTES 10 Powemam Plus 60 UPS ln stallation Manual...
Page 147: ...2 I FRONT Powerware Plus 80 UPS installation Manual A 13...
Page 153: ...5 61 CRE47Eo By L ORLANDO RMWON A ONE B 269r Powemare Plus 90 UPS lnstailation Manual A 19...