Installation
42
Powerware
®
Prestige Series Installation and Operator’s Manual for IBM Applications (6000 VA)
Uncontrolled Copy
REPO Switch
Green Ground Wire
Plug/Receptacle
PPU Connector
Junction Box
Conduit
Figure 11. Standard REPO Cord
If you are using the optional REPO cord junction box, place the conduit
through the access hole on the junction box. Connect the exposed
conduit wires to the corresponding compression terminals (see the
following table). Tighten the compression terminals with a screwdriver
(see Figure 12).
Mounting Holes
Plug/Receptacle
PPU Connector
Three Foot Cord
Terminal Block
Access Hole
for Conduit
Figure 12. Optional REPO Cord Junction Box