background image

3

INSTALLATION SITE

The driveway where the automatic barrier (boom gate) will be installed must 

be previously analyzed, by checking the entire infrastructure of the place, 

the floor conditions, the electrical network, the width of the passage span,

the height of the clearance (if any), the flow of vehicles and the need to use 

optional accessories. That done, the equipment that best fits the needs of 

the location should be chosen.

 

NOTE:

 In driveways with low ceilings, the use of folding beams is generally 

recommended. In this case, one must consult with the factory so that it can 

provide one with the appropriate size beam for installing it on the specific

location.

 

IMPORTANT

One must check if there are any obstacles that may interfere with the 

complete opening and closing of the beam.

If  so,  the  installation  of  the  equipment  will  be  impaired,  making  it 

necessary to repair the infrastructure of the site.

Carefully choose the model of the automatic barrier according to its 

technical features and the location where it will be installed. Observe 

the need for optional accessories. Calculate the flow of vehicles on 

site.

 

NOTE:

 If the floor does not meet the previous specifications, a concrete 

plinth (foundation) must be provided for anchoring the cubicle, attending 

to the dimensions its base. Generally, the concrete plinth should be 100 

mm (~4 in) high above the floor level.

CONTENTS

Installation site .....................................................................................................................................3

General features ..................................................................................................................................5

Technical specifications .....................................................................................................................5

Equipment dimensions ......................................................................................................................6

Construction of the base for anchoring the cubicle ..................................................................7

Installing the automatic barrier .......................................................................................................8

Balancing the beam and checking the chain .............................................................................12

Adjusting the magnet bars .............................................................................................................13

Operation ...........................................................................................................................................14

TRIFLEX CONNECT BRUSHLESS Electronic Control Board  ...................................................14

Encoder system (‘Reed Digital’) ....................................................................................................14

Summary of Contents for BARRIER BRC

Page 1: ...ARRIER BRC JETFLEX BRUSHLESS Technical Manual P09754 09 2021 Rev 0 Made by Motoppar Ind stria e Com rcio de Automatizadores Ltda Av Dr Labieno da Costa Machado 3526 Distrito Industrial Gar a SP CEP 17...

Page 2: ...ng of the beam If so the installation of the equipment will be impaired making it necessary to repair the infrastructure of the site Carefully choose the model of the automatic barrier according to it...

Page 3: ...will be fixed close to the automatic barrier cubicle GENERAL FEATURES Universal cubicle the beam can be installed on either side of the cubicle Release system for manual unlocking up to 4 5m 14 8 ft E...

Page 4: ...el this provides the product with a better performance operation FRONT INSPECTION DOOR MINIMUM 3 4 CONDUIT FOR WIRING PLACED IN THE CENTER OF THE CONCRETE PLINTH Ceiling Ceiling Base of the barrier Ba...

Page 5: ...e from the plinth and drill the holes in the previously marked locations Note Drill 04 holes with a 10mm drill and at least 80mm 3 2 in deep 4 Insert the anchor bolts into the holes in the concrete pl...

Page 6: ...V Note Use 2 50mm cables Use a dedicated circuit breaker i e a circuit breaker to which only the barrier will be connected 11 Check define the alignment of the bean opening and closing Use mechanical...

Page 7: ...tched and ready for operation With your thumb apply an even pressure on the chain If it does not bend it is properly stretched If the chain is loose adjust it using the belt tensioning bolts using a w...

Page 8: ...whose function is to start the three phase induction motor from a single phase AC network and a logic controller to perform the Variable frequency drive operations For more information refer to the T...