Note:

 In the first activation, the beam will move slowly in an opening and 

closing movement, as it will be reading the path. Right after the reading 

is done, its operation is right, and the automatic barrier starts to operate 

at the factory default speed. For more accurate adjustments, refer to the 

Electronic Control Board options.

OPERATION

The operation of the automatic barrier is performed by a microcontrolled 

Electronic Control Board, activated via remote control or any other device 

that provides an NO (Normally Open) contact.

‘TRIFLEX CONNECT BRUSHLESS’ ELECTRONIC 
CONTROL BOARD 

The Electronic Control Board operates with a Variable frequency drive, 

whose  function  is  to  start  the  three-phase  induction  motor  from  a 

single-phase AC network and a logic controller to perform the Variable 

frequency drive operations. For more information, refer to the 'TRIFLEX 

CONNECT BRUSHLESS' control board's manual.

ENCODER SYSTEM ('REED DIGITAL')

The beam position is monitored by an Encoder. Also called the Digital 

Signal  Angular  Positioning  Transducer  System,  it  is  used  to  precisely 

control and monitor the movements of the gearmotor.

Therefore,  there  is  the  possibility  of  storing,  in  the  memory,  certain 

positions of the barrier and then allowing the Electronic Control Board 

to control the opening and closing. This is achieved by means of sensors 

that inform the direction of travel and the position of the bean during 

operation.

So, it is a device responsible for the reading, memorization, and accuracy 

of a beam's path.

Summary of Contents for BARRIER BRC

Page 1: ...ARRIER BRC JETFLEX BRUSHLESS Technical Manual P09754 09 2021 Rev 0 Made by Motoppar Ind stria e Com rcio de Automatizadores Ltda Av Dr Labieno da Costa Machado 3526 Distrito Industrial Gar a SP CEP 17...

Page 2: ...ng of the beam If so the installation of the equipment will be impaired making it necessary to repair the infrastructure of the site Carefully choose the model of the automatic barrier according to it...

Page 3: ...will be fixed close to the automatic barrier cubicle GENERAL FEATURES Universal cubicle the beam can be installed on either side of the cubicle Release system for manual unlocking up to 4 5m 14 8 ft E...

Page 4: ...el this provides the product with a better performance operation FRONT INSPECTION DOOR MINIMUM 3 4 CONDUIT FOR WIRING PLACED IN THE CENTER OF THE CONCRETE PLINTH Ceiling Ceiling Base of the barrier Ba...

Page 5: ...e from the plinth and drill the holes in the previously marked locations Note Drill 04 holes with a 10mm drill and at least 80mm 3 2 in deep 4 Insert the anchor bolts into the holes in the concrete pl...

Page 6: ...V Note Use 2 50mm cables Use a dedicated circuit breaker i e a circuit breaker to which only the barrier will be connected 11 Check define the alignment of the bean opening and closing Use mechanical...

Page 7: ...tched and ready for operation With your thumb apply an even pressure on the chain If it does not bend it is properly stretched If the chain is loose adjust it using the belt tensioning bolts using a w...

Page 8: ...whose function is to start the three phase induction motor from a single phase AC network and a logic controller to perform the Variable frequency drive operations For more information refer to the T...

Reviews: