11
Step 7:
Set the rack to the fullest extent of the gate leaf with solder or screw every 11.81 or 15.75 inches.
Step 8:
If the gate leaf this warped, provide shims to ensure alignment of the rack. In some cases that the rack must pass the length of
the sheet. In this case, it provides a clamps so do not skip teeth in starting the machine.
Step 9:
After fixing the rack, definitely fix the operator on the floor or concrete base, definitely tightening the screws.