12
10 - LIMIT SWITCH INSTALLATION
Step 1:
With the gate closed, place the magnet support on the rack, positioned in front with Reed's operator. This magnet will trigger
the close limit switch.
Step 2:
Open the gate completely and place the other magnet support on the rack, in front of the operator REED. This magnet will
trigger the open limit switch.
Step 3:
Trigger the engine and see if the REED's are off properly. If necessary, reverse the board connector.
After the brackets set of magnets, make final adjustments, moving them to the right side or left side, depending on the selected setting.
Step 4:
To finish the installation of the operator, is required before the operation, screw the fairings with 1 screw 0.24 x 0.79 inches (now
available on the product).
Summary of Contents for DZ 1500
Page 1: ...DZ PREDIAL DZ CONDOMINIUM DZ 1500 Technical Manual...
Page 2: ......
Page 30: ...30 26 REPAIR PARTS DZ PREDIAL JET FLEX 60HZ U...
Page 31: ...31...
Page 32: ...32 DZ CONDOMINIUM JET FLEX 60HZ U...
Page 33: ...33...
Page 34: ...34 DZ 1500 JET FLEX 60HZ Z12 U...
Page 35: ...35...