8
3º Step
. Make sure that the gate leaf does not jam in the opening and closing
movement. The slide rail of the gate must be perfectly rectilinear, level, unobstructed
periodically from any element or dirt that makes it difficult to slide the pulleys all the
way, as shown in the figure below.
INSTALLATION AND FIXING THE OPERATOR
Before installing the operator, remove all unnecessary cables and disable any
equipment or system connected to the mains.
EQUIPMENT DIMENSIONS
226 mm
240 mm
160 mm