6
7
OBS:
Measurements in mm. The base plate must be leveled to allow the
equipment to perform better.
INSTALLING THE BARRIER
1. When fixing the barrier, notice that the cabinet inspection door must
face the side of the road or vehicle passage.
76 mm (3")
BUILDING THE BASE PLATE TO INSTALL THE
CABINET
Build a concrete base so that the highlighted direction (350) faces the curb
(street, passing vehicles) according to the suggested dimensions.
Cover
Barrier Base
Articulated barrier profile
(EXTRA) 180 mm
USEFUL LENGTH = BARRIER LENGTH -180 mm
(BARRIER 110 mm)
(Ground clearance)
Barrier fixing deduction 283 mm
Useful length = Barrier length -283 mm
Barrier length
¾” CONDUIT PIPE
(MINIMUM) FOR THE
CABLES POSITIONED IN
THE CENTER OF THE BASE
INSPECTION DOOR
VEHICLE P
ASSAGE
Linear barrier profile
CURB USEFUL HEIGHT
210 (OPENING DEDUCTION)
30 (SAFET
Y MAR
GIN)
OPEN BARRIER HEIGHT
DIST
ANCE FR
OM BARRIER BASE T
O C
O
VER
GR
OUND CLEARANCE A
T BARRIER BASE
(FIXING – DEDUCT FROM THE BARRIER LENGTH 280 mm)