background image

8

To install the equipment, follow the steps below:

Step 1: 

The gate axis shall be between 100 mm and 300 mm below the central 

point of the gate leaf.

Step 2: 

Remove the top rail cover and install the securing brackets on the opposite 

side to the drive nut pin.

ARTICULATING 

ARM

GATE LEAF

HALF OF

GATE LEAF

GATE AXIS

Summary of Contents for POTENZA PREDIAL

Page 1: ...WARNING Do not operate the equip ment without first reading the instruction manual Technical Manual POTENZA PREDIAL BV...

Page 2: ...NS 3 TECHNICAL CHARACTERISTICS 4 TOOLS REQUIRED FOR INSTALLATION 5 ELECTRICAL INSTALLATION 5 PRECAUTIONS WITH THE GATE BEFORE INSTALLATION 7 FIXATION AND INSTALLATION OF THE OPERATOR 7 ANALOGIC LIMIT...

Page 3: ...n read and follow all instructions contained in this ma nual carefully Before installing the operator make sure that the local power supply is compatible with that required on the equipment iden tific...

Page 4: ...Kg MAX DIMENSION OF THE GATE HEIGHT Value in meters 0 15 x 2 LENGTH 4 0 m HEIGHT Value in meters 0 15 x 2 LENGTH 4 0 m OPERATOR TYPE OVERHEAD OVERHEAD OVERHEAD MODEL Single Phase Single Phase Jet Fle...

Page 5: ...electrical distribution box 3 4 diameter conduit between the electrical distribution box and the total disconnect device 3 4 diameter conduit between the total shut off device and the automator s con...

Page 6: ...mm 500 V according to the norm NBR NM 247 5 The power conductor of a product for external use must be a flexible cable 3 x 0 75 mm 500 V according to IEC 60245 57 It is mandatory that the ground term...

Page 7: ...near the button fixed control Check the manual release system fastened next to the actuation element of the unlocking Move the door leaf manually opening and closing and observe the required effort T...

Page 8: ...1 The gate axis shall be between 100 mm and 300 mm below the central point of the gate leaf Step 2 Remove the top rail cover and install the securing brackets on the opposite side to the drive nut pin...

Page 9: ...9 Step 3 Insert the closing stop with the rubber facing the drive nut Step 4 Insert the opening stop with the rubber facing the drive nut Step 5 Place back the top cover on the rail...

Page 10: ...the figure below Step 7 Attach the drive lever to the pin of the drive nut of the operator Step 8 Weld the drive lever on the gate leaf keeping the distance of 250 mm between the center of the gate sh...

Page 11: ...with the gate open perform the same procedure for the opening stop ANALOGIC LIMIT SWITCH INSTALLATION Step 1 Position the limit switch magnet into the drive nut housing Position the opening and closin...

Page 12: ...12 Prior to the operation of the operator it is mandatory to screw the panel cover with 4 x 3 5 x 12 mm screws available in the kit PROTECTION RUBBER...

Page 13: ...limit switch A Make sure that the power supply is connected correctly B Replace fuse with the same specification C Make sure that there is no object blocking the operation of the gate D Replace the li...

Page 14: ...MOTOPPAR IND STRIA E COM RCIO DE AUTOMATIZADORES LTDA Av Dr Labieno da Costa Machado 3526 Distrito Industrial CEP 17400 000 Gar a SP Brazil www ppaamerica com 55 14 3407 1000 callcenter ppa com br...

Reviews: