9
Step 4:
Fix the gate operator at the base of the gate with screws.
Step 5:
Position the sheath assembly support on the top of the gate and install it
through the screw, obeying the distance of 110 mm between the end of the gate
leaf and the sheath assembly.
FIX THE
OPERATOR
110 mm