Step 17

Install the stepped Apply Plate flat side up. Make sure the bearing is on top of 

the C-1 hub.  Install the C-2 hub and start the clutch ordering with a Friction 

against Apply Plate. Alternate Kolene® Steel and Frictions (8 Frictions and 8 

Steels), ending with a Steel Plate on top.  Install a bronze washer on the C2 hub. 

Install the P1 Plate, Sun Gear and Snap Ring. Clearance should be from .070” to 

.085”.

With rotating module in Converter housing you may air check the C-1 and the 

C-2 with a rubber tipped blow gun. 3/8” hole should be at the 7 o’clock position 

for the C1, C2 needs to be at the 5 o’clock position.

Step 18

Depress the C3 Top Plate and remove the Snap Ring, Top Plate, Clutch Pack, 

Apply Plate, Springs and the C3 piston.  Install the C3 piston (furnished), (bleed 

hole nees to be at the 12 o’clock position) install return springs onto new .125” 

Apply Plate (furnished).  Install Apply Plate groove side up.  Install the Fric

-

tions and Steels in same manner as the C4; 6 Frictions and 5 Kolene® Steels. 

Aligning the slots with a 12 o’clock hole position. Install the C3 Pressure Plate 

(furnished).  Depress the plate and install the Snap Ring with the gap at the 1:30 

position. Clearance should be from .065” to .075”. 

Retain the bearing with assembly gel.  Install the rotating module, making sure 

module is fully seated.  Install Converter housing with new gasket and torque to 

45 ft.lbs. Check end play @ turbine shaft (.011” - .060”) Perform Valve Boy Modi

-

fications per Valve Body Kit instructions.

NOTE: Retain the C1, C3 Pressure Plates and C3, C4 Apply Pistons 

for core deposit refund.

Step 19

IMPORTANT: Do not start the engine unless the transmission has been filled with trans-

mission oil, minimum 16 quartz with Shallow Pan. 18 quartz with Heavy Duty DEEP pans. 

Such as PPE aluminum pans.

Step 20

Complete the assembly and return the modified transmission to its original position on your 

vehicle. Installation complete once the oil is filled to the correct level.

5 Frictions 4 Steels - Stock

6 Frictions 5 Steels - Preceding Kit

7 Frictions 6 Steels - Current Kit

Summary of Contents for Stage 4

Page 1: ...Stage5 Installation Guide Rev 01 31 18 v19 PPEdiesel com Technical Support 714 985 4825 2006 2010 Allison LBZ LLM STAGE 5 TRANSMISSION KIT INSTALLATION GUIDE...

Page 2: ...mages or expenses by reason of use or sale of any such equipment The Seller assumes no liability regarding the improper instal lation or misapplication of its products It is the installer s responsibi...

Page 3: ...clock position Install return springs onto the new 250 Pressure Plate and install with groove side up Install C 4 clutch pack fur nished Starting with Friction against Apply Plate and alternating wit...

Page 4: ...ance should be from 060 to 075 Reassemble the rear section be sure to align the slot in Sun Gear Spacer with lube hole in Shaft Shoulder when installing extension housing The housing will be spring lo...

Page 5: ...ation Guide 5 Remove tube Step 5 Remove Pressure Switch Step 6 Separator Plate Step 8 Enlarge two holes on separator plate with the smaller drill furnished 125 Step 7 Separate the VB to access the Sep...

Page 6: ...the trim valves Install the assembly into the Valve Body Don t force them a little wiggle and they will drop in Install outer spring solenoid valves and solenoids as shown Outer spring must be install...

Page 7: ...ator BST Assembly A1 Lockup BST Hot Rod Allison Lockup Boost Valve Step 13 Remove and discard the original Converter Flow Valve Spring and End Plug Install the New Valve 3 8 Check Ball Spring and new...

Page 8: ...ove retaining pin Remove valve stop no need to remove spring or valve Install steel shim on spring side of Plug Reinstall Plug and Retaining Pin Stator Step 14 Make sure all valves are free Remove the...

Page 9: ...install into transmission There have been a few of these leaking from the bell housing bolts due to roughness in the casting A little silicone under the bolt heads is highly recommended Step 16 Assemb...

Page 10: ...up Install the Fric tions and Steels in same manner as the C4 6 Frictions and 5 Kolene Steels Aligning the slots with a 12 o clock hole position Install the C3 Pressure Plate furnished Depress the pla...

Page 11: ...ed finish for corrosion protection and added heat rejection Uses high quality re usable OEM gasket Plugs cap screws and washers are stainless steel 2001 2011 Allison 1000 Transmission Transmission Pan...

Page 12: ...Stage5 Installation Guide 12 NOTE RETAIN C1 C3 TOP PRESSURE PLATES AND C3 C4 APPLY PISTONS FOR CORE DEPOSIT REFUND NOTE Use the torque converter bolts that are supplied...

Page 13: ...Stage5 Installation Guide 13...

Page 14: ...temperatures by 20 30 degrees This easy installation only takes about 30 minutes Available for 2001 2009 Duramax diesel engines Top View 06 10 Transmission Cooler Billet Input Shaft TGBIS The Billet...

Page 15: ...Stage5 Installation Guide 15 Notes...

Page 16: ...ple 2007 5 Select Vehicle Identification for Vehicle Type for example Light Duty Truck 6 Select Vehicle Identification for Product Make for example GMC Truck 7 Select Vehicle Identification for Produc...

Reviews: