background image

Stage5 Installation Guide

14

PPE Recommended Upgrades

GM Performance Transmission Cooler

Keep your transmission cool with PPE’s performance transmission cooler. Lower 

your  transmission  operating  temperature  with  this  bolt  on  replacement.  60% 

increase  in heat rejection  surface lowers temperatures by 20-30 degrees. This 

easy installation only takes about 30 minutes. 

Available for 2001-2009 Duramax diesel engines.

Top View

06-10 Transmission Cooler

Billet Input Shaft 

(TGBIS)

The Billet Input shaft is for high performance transmissions, helping to withstand 

higher  horsepower  and  torque  levels  for  towing  or  racing.  This  shaft  is  highly 

recommended when installing Stage4 or Stage5 transmission kits. 
Available for 2001-2009 Allison 1000 5 and 6 speed transmissions.

PPE

Summary of Contents for Stage 4

Page 1: ...Stage5 Installation Guide Rev 01 31 18 v19 PPEdiesel com Technical Support 714 985 4825 2006 2010 Allison LBZ LLM STAGE 5 TRANSMISSION KIT INSTALLATION GUIDE...

Page 2: ...mages or expenses by reason of use or sale of any such equipment The Seller assumes no liability regarding the improper instal lation or misapplication of its products It is the installer s responsibi...

Page 3: ...clock position Install return springs onto the new 250 Pressure Plate and install with groove side up Install C 4 clutch pack fur nished Starting with Friction against Apply Plate and alternating wit...

Page 4: ...ance should be from 060 to 075 Reassemble the rear section be sure to align the slot in Sun Gear Spacer with lube hole in Shaft Shoulder when installing extension housing The housing will be spring lo...

Page 5: ...ation Guide 5 Remove tube Step 5 Remove Pressure Switch Step 6 Separator Plate Step 8 Enlarge two holes on separator plate with the smaller drill furnished 125 Step 7 Separate the VB to access the Sep...

Page 6: ...the trim valves Install the assembly into the Valve Body Don t force them a little wiggle and they will drop in Install outer spring solenoid valves and solenoids as shown Outer spring must be install...

Page 7: ...ator BST Assembly A1 Lockup BST Hot Rod Allison Lockup Boost Valve Step 13 Remove and discard the original Converter Flow Valve Spring and End Plug Install the New Valve 3 8 Check Ball Spring and new...

Page 8: ...ove retaining pin Remove valve stop no need to remove spring or valve Install steel shim on spring side of Plug Reinstall Plug and Retaining Pin Stator Step 14 Make sure all valves are free Remove the...

Page 9: ...install into transmission There have been a few of these leaking from the bell housing bolts due to roughness in the casting A little silicone under the bolt heads is highly recommended Step 16 Assemb...

Page 10: ...up Install the Fric tions and Steels in same manner as the C4 6 Frictions and 5 Kolene Steels Aligning the slots with a 12 o clock hole position Install the C3 Pressure Plate furnished Depress the pla...

Page 11: ...ed finish for corrosion protection and added heat rejection Uses high quality re usable OEM gasket Plugs cap screws and washers are stainless steel 2001 2011 Allison 1000 Transmission Transmission Pan...

Page 12: ...Stage5 Installation Guide 12 NOTE RETAIN C1 C3 TOP PRESSURE PLATES AND C3 C4 APPLY PISTONS FOR CORE DEPOSIT REFUND NOTE Use the torque converter bolts that are supplied...

Page 13: ...Stage5 Installation Guide 13...

Page 14: ...temperatures by 20 30 degrees This easy installation only takes about 30 minutes Available for 2001 2009 Duramax diesel engines Top View 06 10 Transmission Cooler Billet Input Shaft TGBIS The Billet...

Page 15: ...Stage5 Installation Guide 15 Notes...

Page 16: ...ple 2007 5 Select Vehicle Identification for Vehicle Type for example Light Duty Truck 6 Select Vehicle Identification for Product Make for example GMC Truck 7 Select Vehicle Identification for Produc...

Reviews: