Pratt & Whitney Rzeszów S.A.
MAINTENANCE MANUAL
PZL-10W ENGINE
73-22-02
1992.08.28
Page 402
Export Control Classification: PL/UE 9E999
( 8 )
Install the clamps ( 1 3 ) on the pipes ( 8 ) , (9 ) and ( 15) .
( 9 )
Take in the pipe with the rod ( 1 4 ) , tighten the nuts and safety wire them.
( 1 0 )
Check the push rod operation, and adjust if necessary (see 71-02-00, ADJUSTMENT / TEST, item 5.E, subitem 4).
( 1 1 )
Check the operation of the power turbine rotational speed limiter during i the engine running (see 71-02-00,
ADJUSTMENT / TEST, item 4.C, subitem 7).