PreciseFlex_Robot
96
3. Manually move the robot into the configuration shown below.
a. The top cover of the outer link will need to be removed by removing the 4 M3 X 20 SHCS
that are located in counter bores under the outer link.
b. If the optional Linear Axis is installed, move the Linear Axis carriage to the hard
stop near the connector end cap. For the Linear Axis calibration be sure to use
CALPP Rev 21 or later.
4. Ensure Z-axis is resting on the lower hard stop by releasing the Z axis brake by pushing on the
brake release button under the shoulder while supporting the robot arm with your hand, and
lowering the robot arm gently until it rests on the lower hard stop.
5. If the Calibration Pins have not already been removed from the robot, it may be necessary to
remove the top cover of the robot by removing 4 M5 Low Head screws with a 3.0mm hex driver
and then to remove the front cover to access the bag with the Calibration Pins which is inside the
front cover extrusion at the bottom.
6. Insert a M3 X 30mm Calibration Dowel Pin into the J4 (wrist) pulley with the gripper positioned
under the outer link and rotate the gripper back and forth until the pin drops into a slot in the outer
link, locating the gripper under the center of the outer link.
7. Insert a tapered .5in Calibration Dowel Pin into the hole in the bottom of the shoulder. Rotate the
inner link counterclockwise until it rests against this pin as shown below.
8. Insert an tapered .5in Calibration Dowel Pin into the hole on inner link as shown below. Rotate
outer link clockwise until it rests against the dowel pin.
9. If the robot is installed on a linear rail, push the rail carriage all the way to the hard stop at the
linear rail connector end cap.
Summary of Contents for PF3400
Page 8: ......
Page 32: ...PreciseFlex_Robot 24 Appendix B TUV Verification of PF400 Collision Forces...
Page 33: ...Introduction to the Hardware 25...
Page 34: ...PreciseFlex_Robot 26...
Page 35: ...Introduction to the Hardware 27...
Page 37: ...Introduction to the Hardware 29 Appendix C Table A2 from ISO TS 15066 2016...
Page 38: ...PreciseFlex_Robot 30 Table A2 Continued...
Page 41: ...Introduction to the Hardware 33 PF400 500gm Safety Circuits PF3400 3kg Safety Circuits...
Page 45: ...Installation Information 37...
Page 46: ...PreciseFlex_Robot 38...
Page 47: ...Installation Information 39...
Page 48: ...PreciseFlex_Robot 40...
Page 54: ...PreciseFlex_Robot 46 Schematic System Overview...
Page 55: ...Hardware Reference 47 Schematic FFC Boards Revision B PF400...
Page 56: ...PreciseFlex_Robot 48...
Page 57: ...Hardware Reference 49 Schematic FFC Boards Revision C PF400...
Page 58: ...PreciseFlex_Robot 50 Schematic FFC Boards 3kg PF400...
Page 59: ...Hardware Reference 51...
Page 60: ...PreciseFlex_Robot 52 Schematic Safety System Overview PF400 CAT3...
Page 61: ...Hardware Reference 53...
Page 62: ...PreciseFlex_Robot 54 Controller Power Amplifier Connectors Control Board Connectors...
Page 63: ...Hardware Reference 55 Gripper and Linear Axis Controller Connectors...
Page 64: ...PreciseFlex_Robot 56...
Page 65: ...Hardware Reference 57...
Page 66: ...PreciseFlex_Robot 58 Schematic Slip Ring for 60N Gripper...
Page 67: ...Hardware Reference 59...
Page 68: ...PreciseFlex_Robot 60...
Page 69: ...Hardware Reference 61...
Page 70: ...PreciseFlex_Robot 62...
Page 71: ...Hardware Reference 63...
Page 72: ...PreciseFlex_Robot 64...
Page 73: ...Hardware Reference 65 Motor 60N Gripper...
Page 74: ...PreciseFlex_Robot 66...
Page 106: ...PreciseFlex_Robot 98 b The CALPP application takes about 1 minute to run...
Page 124: ...PreciseFlex_Robot 116 Wiring for 60N Gripper with Battery Pigtail Wiring for Pneumatic Gripper...
Page 125: ...117 Wiring for Vacuum Gripper Wiring for Vacuum Pallet Gripper...