PD6820 Loop-Powered Process Meter Instruction Manual
12
Mounting
The PD6820 has two slotted mounting flanges that may be used for pipe mounting or
wall mounting. Alternatively, the unit may be supported by the conduit using the
conduit holes provided.
Refer to
Mounting Dimensions
, page 47 for details.
WARNING
Do not attempt to loosen or remove flange bolts while the meter is
in service.
Cover Jam Screw
The cover jam screw should be properly installed once the meter has been wired and
tested in a safe environment. The cover jam screw is intended to prevent the removal
of the meter cover in a flameproof environment without the use of tools. Using a M2
hex wrench, turn the screw clockwise until the screw contacts the meter. Turn the
screw an additional 1/4 to 1/2 turn to secure the cover. Caution: Excess torque may
damage the threads and/or wrench.
Connections
WARNINGS
Static electricity can damage sensitive components.
Observe safe handling precautions for static-sensitive components.
Use proper grounding procedures/codes.
If the meter is installed in a high voltage environment and a fault or
installation error occurs, high voltage may be present on any lead or
terminal.
To access the connectors, remove the enclosure cover and unscrew the two captive
screws that fasten the display module. Disconnect the ribbon cable and remove the
display module. Signal connections are made to a four-terminal connector in the base
of the enclosure. Grounding connections are made to the two ground screws
provided on the base – one internal and one external.