2.7 Media connections
2 - 20
© Precitec GmbH & Co. KG • EN 09/2019
2.7
Media connections
Fig. 2-10
Media connections, laser head
1
Cutting gas, G 1/8
3
BNC connection, sensors
2
Water connection M5
(2x)
LC-BA-
oM
ed
2
3
1
Attention – Media connections!
Please note the connection dimensions and the permitted maximum
pressure load on the media connections
(cutting gas and water cooling circuit)
,
see