Take Up Roller Replacement
About
This procedure provides instruction to remove and replace the Take Up Roller.
CAUTION
: Two running belt gauges, Precor part number 20007-101, are required.
It is important that this procedure be followed to maintain correct drive belt and run-
ning belt tension. Improper tensioning of the belt will lead to premature running belt
wear, premature driver roller bearing failure and premature Take Up Roller bearing
failure.
Procedure
Review entire procedure before starting.
1. Switch the input power OFF and unplug the power cord.
2. Remove the front hood.
3. Remove the end cap and belt guard covers (see
"End Cap & Belt Guard Cover Replace-
4. Remove the left and right deck trim covers.
Removal Instructions
5. Remove running belt tension by alternately loosening the left and right Take Up Roller
mounting/adjustment bolts. Remove the mounting bolts, lift and slide the Take Up Roller
out of the running belt.
Installation Instructions
6. Slide the new Take Up Roller through the running belt and slide into position. Evenly
hand tighten the left and right Take Up Roller mounting bolts a few turns only.
(Undefined variable: TRM700-16Base.ServiceManualTitle)
66
5 Replacement Procedures
Take Up Roller Replacement