©2019 Precor Inc. | Back Extension RSL 313 | Assembly Guide
11
7
Straighten the front two guide rods to a vertical position. Have your assistant
lift the guide rods up into the upper part of the frame.
8
Tools: Hex wrench, 6 mm
Torque wrench
While the
assistant is holding the rods into the upper frame, reinsert the two
bolts removed in
step 1
underneath the guide rods in the bottom frame, and
secure to the kick plate. Let the guide rods drop onto the bolts and fully tight
-
en the bolts.
Tighten M10 screws to 32 ft-lb (43 N-m) of torque.
9
1 M10 x 65 mm SHCS
2 washers, 11 mm
1 M10 nylon lock nut
Tools: Hex wrench, 8 mm
Socket wrench, 17 mm
Replace the cap to the top of the rod and secure top of rod to weight stack
tower frame.
10
1 washer, rubber, black
1 washer, silver 13.5 mm ID x 35 mm OD
Place the washers into the top of the cable connector in the add-on weight
handle.
52
33
40
49
51
33
52
42
51
51
40
49