4.
Plug
1
in the power cord and switch the power
ON
.
5. Tension running belt to specification and verify tracking alignment, see
Tension and Tracking Adjustment" on page 52
.
6. Reinstall the endcaps and belt guards.
7. Reinstall the hood cover.
8. Do the Operation Verification tests (see
"Operation Verification" on page 17
) and
return to service..
1
Device power cord connector or electrical cable male connector that is inserted into an
electrical receptacle "outlet" (also called the plug-in).
Contact Precor Customer Support at support@precor.com or 800.786.8404 with
any questions.
Page 76
6 Replacement Procedures
Take-up Roller Replacement