Bolt equipment to floor
Precor recommends that the strength equipment be bolted down at all anchoring
points. Bolting is made possible through the bolt holes on each foot. The inside
diameter of each hole is 14.3 mm.
NOTE
As floor materials vary, it is important to consult a licensed
contractor to advise on proper bolting techniques and appropriate
fastener types.
Figure 14
CAUTION
Standards can change. Precor recommends you keep apprised of
your local industry standards. Precor shall not be held liable for failure to
properly bolt the strength equipment to the floor.
Apply labels
Figure 15
1. Attach the
Instructional label
to the inside shroud under the top cap. The label should be
aligned with the left and right edge of the tray on the top cap. There are small marks on the
lower lip of the top cap to indicate the proper label position.
Verify operation of equipment
Once assembly is complete, verify safe operation by checking the following points:
l
Cable tension is correct and the cable is moving smoothly on its pulleys.
l
Movement arm is stable and moves smoothly through its range of motion.
l
Adjustment points are stable and move smoothly through their range of motion.
Disassemble the equipment
You may occasionally need to disassemble this unit to move it between rooms or buildings. In such
cases, reverse the assembly steps in this manual to
disassemble. After the unit has been moved, follow the steps in this manual to reassemble it.
WARNING: You will need assistance to disassemble this unit. The weight tower can become
unstable during parts when disassembling. Make sure the weight tower is supported safely
throughout the process and NEVER attempt to disassemble by yourself.
Maintenance information
It is important that the equipment be maintained in accordance with the Vitality Selectorized Line
Maintenance Guide. Visit any Vitality Selectorized product page at
www.precor.com
to view the
guide.
©2021 Precor Incorporated
|
VSL Multi-Press
|
Assembly Guide
|
P/N CWR247777-102 ENU 31 July 2021
|
5