PREMAS® 4.0 Installation and Commissioning Manual
Page 21 / 44
4.2
Installation of the product
The PREMAS® 4.0 system is designed for easy installation and commissioning.
This chapter describes the necessary steps and actions for a successful start-up.
4.2.1
Removal of transport and packaging elements
The PREMAS® 4.0 system consists of several elements which are packaged individually.
Each package is labeled for ease of identification.
Do not remove the element from the packaging except you are going to install its content.
This procedure will protect the element and ease later identification.
4.2.2
Unpacking the product
Unpack your PREMAS® 4.0 package
Check delivered items with the packing list
Read this installation guide and the online operational manual carefully (see
PREMAS Knowledge Base:
https://premas.ch/premas-products-services/premas-
Review of the scope of delivery
Check that the package contains the ordered parts and check the packing list, which is part
of the delivery documents of each system.
Installation and commissioning must be carried out by a suitably qualified and trained
electrician in compliance with the applicable regulations and laws.
The installer is responsible for employing experienced and qualified technical personnel.