www.mounts.com | North America 800.368.9700 | Interna1-714-632-7100
Figure 6
. Low Profile Installation
2
1
Tension Knurl
Insert universal bracket
to the tri -lock, then
rotate the projector 180
°
The alignment slot
must be in direct
alignment with the
safety knob to lock
the mounting
bracket to the upper
assembly.
To secure the
mount, replace the
red safety knurl
knob with one (1)
M6 x 25 security
screw (supplied).
Projector
Tri -Lock Opening
Universal Mount
Alignment Slot
Securing the Projector to the Upper Assembly
Step 1. Make sure the three-knurl knobs are loosened to fully expose to the "tri-lock" mounting plate in the base of the upper assembly.
Step 2. Carefully lift the projector and insert the mounting bracket mating special tri-lock cutout into the mating portion of the upper assembly.
Step.3 Once inserted, rotate the projector and mounting bracket 180º and secure the rear safety knob first to prevent further rotation of the bracket
in the upper assembly
Step 4. Tighten the remaining two tension knurl knobs until the mount becomes rigid. The safety knob should line up with the alignment slot on
the mounting bracket
Follow the numbering sequence prior to securing the projector to the upper assembly.
Suivez la séquence de numérotation avant de le fixer le projecteur à l'assemblage supérieur
Installation Guide
Installationsanleitung, Guía de Instalacíon, Guida de Installazione, Guide d’Installation, Installatie gids
PBC-UM SERIES