67
Chapter 6.2 par. 1. Grammar adjusted.
20-01-2016
Adjusted blue colored tables and styling.
21-01-2016
Grammar adjusted in the following chapters: Introduction, chapter 1.1, 1.1.1, 1.1.2,
1.1.3,
Chapter 2.0, 2.0 legend, Chapter 3.1.2, 3.1.3, 3.2, Chapter 4.1, 4.2, 4.4, 4.5.2, 4.6.1,
Chapter 5.1, Chapter 6.1, 6.3.1, Chapter 7.1, Chapter 8.
Chapter 9 Declaration of Conformity adjusted to new standard 2014/68/EU
3.2_R01
15-06-2016
Chapter 3.2 added about the assembly of the components on the buffer tank.
3.3_R01
25-11-2016
Replaced text in introduction.
3.4_R01
28-03-2017
Chapter 4. replaced figure 13. For image with white font on buttons.
Chapter 4.1. replaced images of buttons with images that have white fonts.
Chapter 4.7. replaced image of button with image of that has white font.
Chapter 4.8. replaced image of button with image of that has white font.
Chapter 3.1.6. added description about the Leak Detection Measurement.
Chapter 3.2.1. Revised the image about the vertical tank and added numbers for the
heat injection pipe and 3
rd
pressure sensor. Adjusted introduction text of chapter.
Description of heat injection pipe also added. Added paragraph for the leak detection
measurement.
Adjusted size of function column in description table.
Chapter 3.2.2. added chapter about the Vertical buffer tank in a DUO setup.
Chapter 3.2.2. about the Horizontal buffer tank has become 3.2.3. Supplemented the
setup of the buffer tank with the 3 different possibilities of setup.
Chapter 3.2.4. Added chapter about the Horizontal buffertank in a DUO setup.
Chapter 3.2.5. Added chapter about combining the vernit and hornit systems.
Chapter 3.3.1. Adjusted image which now includes pressure sensor 5/6. And
different description of PRESS-Control.
Chapter 3.3.2. Adjusted image with different description of PRESS-Control.
Chapter 3.3.3. Added chapter about the schematic overview of a VERNIT DUO
system.
Chapter 3.3.4. Added chapter about the schematic overview of a HORNIT DUO
system.
Chapter 4.4.3. Supplemented the description at point 10 and 11 with designation
about the leak detection measurement.
Chapter 2.7 replaced image with new version including 3 more designations.
Chapter 2.8 added chapter about the optional tracing ribbon around the sensor.
Chapter 3.1.7. Added chapter about how the optional tracing ribbon operates.
Summary of Contents for HORNIT N2
Page 2: ...2...