43
9
Appendix
In addition to this document, the description of the content extends to the following appendixes:
Appendix ID
Description
Version
-
-
V0.0_R00
10
Document history
Version
1.0
to
2.0
indicates
:
Modification
, in lay-out, structure or other major modifications;
Version
1.0
to
1.1
indicates
:
Supplement
, a chapter of paragraph has been added to the document;
Revision
_R01
to
_R02
indicates
:
Correction
, an image, language error or text error has been corrected.
Version
Date
Modification
2.1_R00
04-04-2016
First release of English translation. Translated from the Dutch version V2.1_R00.
2.2_R00
06-06-2016
Chapter 4.3.1. added about general reaction timings for failures
Chapter 5.1.1. t/m 5.1.4. added about the typical maintenance prescriptions
Chapter 5.3. Supplemented with text about the maintenance contract.
13-06-2015
Chapter 5.1.2 & 5.1.3. added column for interval of 4 years and added line about the
renewal of compressed air hoses.
3.1_R00
06-02-2019
Chapter 4. Added chapter about assembly instructions
Chapter 6.1.4. Text corrected to 2014/68/EU guideline. 10 bar spring safety valve
corrected to general spring safety valve.
3.2_R00
14-02-2019
Chapter 5. Measures during decommissioning added to the document.
3.3_R00
07-01-2020
Chapter. 2. Added chapter about precautions and safety instructions.
Chapter. 3.2.10. Text supplemented to be more clear. Added description about the
specific measures for each system.
Chapter 3.2.11. 3
rd
paragraph corrected he description about slowwhoop.
Chapter 3.2.12. introduction about the emergency stop corrected. The emergency stop is
optional.
Chapter 3.2.13. Functional description added about the BEKOGUARD.
4.0_R00
21-01-2021
Changes in lay-out, structure and other major changes to modernise the document
Summary of Contents for LOX
Page 2: ...2 ...
Page 8: ...8 Figure 1 Schematic setup of the LOX system basics ...
Page 45: ......
Page 46: ......