2
to be conveniently used as either a service or spring brake
relay valve. An exhaust cover is installed that protects the
1/8" balance port when the R-14 anti-compound feature is
not in use.
All parts are interchangeable between the R-12 and R-14
with the exception of the detail components of the R-14
cover. Both valves make extensive use of non-metallic
internal components. For ease of servicing, the inlet/
exhaust valve can be replaced without the need for line
removal.
OPERATION
APPLICATION
Air pressure delivered to the service port enters the small
cavity above the piston and moves the piston down. The
exhaust seat moves down with the piston and seats on the
inner or exhaust portion of the inlet/exhaust valve, sealing
off the exhaust passage. At the same time, the outer or
inlet portion of the inlet/exhaust valve moves off its seat,
permitting supply air to flow from the reservoir, past the
open inlet valve and into the brake chambers.
BALANCE
The air pressure being delivered by the open inlet valve
also is effective on the bottom area of the relay piston.
When air pressure beneath the piston equals the service
air pressure above, the piston lifts slightly and the inlet
spring returns the inlet valve to its seat. The exhaust re-
mains closed as the service line pressure balances the
delivery pressure. As delivered air pressure is changed,
the valve reacts instantly to the change, holding the brake
application at that level.
EXHAUST OR RELEASE
When air pressure is released from the service port and
air pressure in the cavity above the relay piston is ex-
hausted, air pressure beneath the piston lifts the relay
piston and the exhaust seat moves away from the exhaust
valve, opening the exhaust passage. With the exhaust
passage open, the air pressure in the brake chambers is
then permitted to exhaust through the exhaust port, re-
leasing the brakes.
ANTI COMPOUNDING (SIMULTANEOUS
SERVICE AND PARK APPLICATION)
In those applications where the R-14 Relay Valve is used
to control spring brake chambers, the anti-compound
feature may be utilized. With the anti-compound feature
of the R-14 connected, a service application made while
the vehicle is parked is countered by a release of the
parking brakes. To utilize this feature, the exhaust cover
of the quick release portion of the R-14 is removed and a
line is installed which is connected to the delivery of the
service brake valve or relay valve. With no air pressure at
the service port of the R-14, the parking brakes are applied.
If a service brake application is made, air from the service
brake valve enters the exhaust port of the quick release of
the R-14 and moves the diaphragm, blocking the service
port. Air then proceeds into the cavity above the relay
piston, forces the piston down, closing the exhaust and
INLET/
EXHAUST
ASSEMBLY
EXHAUST COVER
FIGURE 2 -
SECTIONAL VIEWS
RELAY
PISTON
INLET
EXHAUST
VALVE
ASSEMBLY
R-14H
R-12V
RETAINING
RING
EXHAUST
SEAT
RELAY
PISTON
EXHAUST
SEAT
RETAINING
RING
EXHAUST
PORT
DIAPHRAGM
BALANCE/QUICK EXHAUST PORT
(ANTI-COMPOUND)
EXHAUST
PORT
Summary of Contents for LE MIRAGE XLII BUS SHELLS
Page 1: ...COACH MANUFACTURER MAINTENANCE MANUAL LE MIRAGE XLII BUS SHELLS PA1564 1ST EDITION...
Page 12: ...Section 00 GENERAL INFORMATION 10 PA1564 FIGURE 13 METRIC US STANDARD CONVERSION TABLE 00005...
Page 13: ...Section 00 GENERAL INFORMATION PA1564 11 FIGURE 14 CONVERSION CHART 00006...
Page 14: ......
Page 30: ......
Page 63: ...SECTION 01 ENGINE PA1564 33 FIGURE 13 POWER PLANT CRADLE INSTALLATION 01140...
Page 108: ......
Page 160: ......
Page 210: ......
Page 229: ...FAULT CODE MANUAL Created on 00 04 25 15 30 1 FAULT CODE MANUAL B7L B7TL B12...
Page 254: ......
Page 281: ......
Page 282: ......
Page 283: ......
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 309: ......
Page 379: ...Section 12 BRAKE AND AIR SYSTEM PA1564 21 FIGURE 38 AIR OPERATED BRAKING SYSTEM WE...
Page 380: ...Section 12 BRAKE AND AIR SYSTEM PA1564 22 FIGURE 39 AIR OPERATED BRAKING SYSTEM W5...
Page 387: ...Section 12 BRAKE AND AIR SYSTEM PA1564 29 FIGURE 46 ABS 6S 5M CONFIGURATION...
Page 418: ...16 BW2158 Honeywell Commercial Vehicle Systems Company 4 2001 Printed in USA...
Page 422: ......
Page 430: ......
Page 438: ......
Page 445: ......
Page 458: ......
Page 534: ......
Page 540: ......
Page 543: ......
Page 660: ......
Page 661: ......
Page 662: ......
Page 663: ......
Page 664: ......
Page 665: ......
Page 666: ......
Page 667: ......
Page 668: ......
Page 669: ......
Page 670: ......
Page 671: ......
Page 672: ......
Page 673: ......
Page 674: ......
Page 675: ......
Page 676: ......
Page 677: ......
Page 678: ......
Page 679: ......
Page 680: ......
Page 681: ......
Page 682: ......
Page 683: ......
Page 684: ......
Page 685: ......
Page 686: ......
Page 687: ......
Page 688: ......
Page 689: ......
Page 690: ......
Page 691: ......
Page 692: ......
Page 693: ......
Page 694: ......
Page 695: ......
Page 696: ......
Page 697: ......
Page 698: ......
Page 699: ......
Page 700: ......
Page 701: ......
Page 702: ......
Page 703: ......
Page 704: ......
Page 705: ......
Page 706: ......
Page 707: ......
Page 708: ......
Page 709: ......
Page 710: ......
Page 711: ......
Page 712: ......
Page 713: ......
Page 714: ......
Page 715: ......
Page 716: ......
Page 717: ......
Page 718: ......
Page 719: ......
Page 720: ......
Page 721: ......
Page 722: ......
Page 723: ......
Page 724: ......
Page 725: ......
Page 726: ......
Page 727: ......
Page 728: ......
Page 729: ......
Page 730: ......
Page 731: ......
Page 732: ......
Page 733: ......
Page 734: ......
Page 735: ......
Page 736: ......
Page 737: ......
Page 738: ......
Page 739: ......
Page 740: ......
Page 741: ......
Page 742: ......
Page 743: ......
Page 744: ......
Page 745: ......
Page 746: ......
Page 747: ......
Page 748: ......
Page 749: ......
Page 750: ......
Page 751: ......
Page 752: ......
Page 753: ......
Page 754: ......
Page 755: ......
Page 756: ......
Page 757: ......
Page 758: ......
Page 759: ......
Page 760: ......
Page 798: ......
Page 886: ......
Page 900: ......
Page 902: ......
Page 904: ......
Page 910: ......
Page 916: ......
Page 920: ......
Page 924: ......
Page 926: ...PROCEDURE NO SAV00044 REVISION 00 Page 2 of 2 Slide out...
Page 930: ......
Page 932: ......
Page 934: ......
Page 940: ......
Page 944: ......
Page 946: ......
Page 954: ......
Page 976: ......
Page 988: ......
Page 992: ......
Page 996: ......
Page 1032: ......
Page 1038: ......
Page 1044: ......
Page 1064: ......
Page 1086: ...Section 22 HEATING AND AIR CONDITIONING PA1564 18 FIGURE 17 DOUBLE SWEEP EVACUATION SET UP...
Page 1118: ...Section 22 HEATING AND AIR CONDITIONING PA1564 50 FIGURE 54 HEATER LINE SHUTOFF VALVES WE...
Page 1124: ......
Page 1125: ...Compressor 62 11052 Rev A WORKSHOP MANUAL for MODEL 05G TWIN PORT COMPRESSOR R...
Page 1126: ...WORKSHOP MANUAL COMPRESSOR MODEL 05G TWIN PORT...
Page 1149: ...Compressor 62 11053 Rev B SERVICE PARTS LIST for MODEL 05G TWIN PORT COMPRESSOR 1 2 3 4 5 6 R...
Page 1177: ......
Page 1178: ......
Page 1179: ...1...
Page 1180: ...2...
Page 1181: ...3...
Page 1182: ...4...
Page 1183: ...5...
Page 1184: ...6...
Page 1185: ...7...
Page 1186: ...8...
Page 1187: ...9...
Page 1188: ......
Page 1212: ......
Page 1223: ...Section 26 XLII SLIDE OUT PA1564 11...
Page 1224: ...Section 26 XLII SLIDE OUT PA1564 12 FIGURE 16 KEYLESS BUSHING INSTALLATION INSTRUCTION...