Section 12: BRAKE AND AIR SYSTEM
8
X3-45 Commuter PA1593 DOB 2400-2489
Section 12 Updated Sept. 2015
year, whichever comes first. Tighten or replace
when necessary. When replacing copper piping,
the parts must be free of burrs, copper cuttings,
and dirt. Blow out piping with compressed air.
Any such particles will destroy sealing seats in
air control units. Also, new piping must be the
same size as the old one.
9.2
FLEXIBLE HOSES
A flexible hose is used normally where it is
impractical to use copper or nylon tubing due to
constant flexing during operation, such as brake
chamber hoses. Hose connections should be
tested for leakage at least every 6,250 miles
(10 000 km) or twice a year, whichever comes
first and tightened or replaced if necessary. Any
hose which is chafed, worn or kinked should be
replaced.
Teflon-braided stainless steel hoses used in the
engine compartment must be replaced only with
similar hoses.
9.3
NYLON TUBING
Nylon tubing is used for air lines in areas where
usage of this material is suitable. Nylon tubing is
flexible, durable, and weather resistant. When
replacing an air line, use nylon tubing only where
it has been used previously.
Nylon air lines must never be routed in areas
where temperature could exceed 200
o
F (93
o
C).
CAUTION
Nylon air lines should be used to replace
existing nylon lines only, and must comply with
the color identification code to ease pneumatic
system troubleshooting.
9.4
AIR LINE OPERATING TEST
If any trouble symptom such as slow brake
application or slow brake release indicates a
restricted or clogged air line, disconnect the
suspected tube or hose at both ends and blow
through it to clear the passage.
Inspect tubing and hose for partial restriction that
may be caused by dents or kinks. If such a
condition is found, the tubing or hose should be
replaced.
9.5
AIR LINE LEAKAGE TEST
With air system fully charged and the brakes
applied, coat all tubing and hose connections
with a soapy solution to check for air leakage.
No leakage is permitted. Leakage can
sometimes be corrected by tightening the
connection. If this fails to correct the leakage,
new fittings, nylon tubing, copper tubing,
teflon-braided stainless steel and flexible hoses
must be installed as applicable.
9.6
MAINTENANCE
Inspect all lines for cuts, swelling, kinks or other
damage or deterioration. Check for lines being
pinched by other components. Retaining clips
and ties must be in place.
Any support or bracket should be in good
condition and mounted firmly in position. Hose
spring guards should be in usable condition and
not distorted. Particular attention should be given
to long lines. Any supporting component (clips,
ties, grommets, etc.) must be secured to prevent
against unnecessary vibration and eventual
loosening of connection. Any detected leak
should be repaired. Be sure nylon lines are not
near areas of intense heat. Check for any
missing grommets or loose material where
chafing or cutting may occur. Replace with new
material as required. In general, lines should be
securely located in position and free from any
binding condition which would hinder air flow.
10. PRESSURE REGULATING VALVES
There is one pressure regulator for the belt
tensioners, and another one installed on vehicles
equipped with the World transmission output
retarder.
The belt tensioner pressure regulating valve is
located in the engine compartment above the
engine air filter and is used to limit the air
pressure in belt tensioners to 45 ± 2 psi (310 ±
15 kPa) (Fig. 7).
The other regulator is located in the engine
compartment, on the engine cradle R.H. side
(accessible through the engine R.H. side door).
It is used for transmission retarder and should
be adjusted to 85 ± 3 psi (586 ± 20 kPa).
Air Pressure
(psi)
Air Pressure
(kPa)
Belt Tensioner
45
310
Retarder
85
586
10.1
MAINTENANCE
Every 100,000 miles (160 000 km) or once every
two years, whichever comes first, disassemble
Summary of Contents for X3-45 2016
Page 4: ......
Page 16: ...Section 00 GENERAL INFORMATION PA1593 12 FIGURE 12 METRIC US STANDARD CONVERSION TABLE 00005...
Page 17: ...Section 00 GENERAL INFORMATION 13 PA1593 FIGURE 13 CONVERSION CHART 00006...
Page 18: ......
Page 26: ......
Page 58: ......
Page 72: ...Section 04 EXHAUST AND AFTERTREATMENT SYSTEM PA1593 14 7 TORQUE SPECIFICATIONS...
Page 73: ...SECTION 04 EXHAUST AND AFTERTREATMENT SYSTEM PA1593 15...
Page 74: ...Section 04 EXHAUST AND AFTERTREATMENT SYSTEM PA1593 16...
Page 76: ......
Page 96: ......
Page 134: ......
Page 176: ...SECTION 06B ELECTRICAL 38 overcurrent working Circuit 306 shorted to ground...
Page 180: ......
Page 202: ......
Page 205: ...Section 09 PROPELLER SHAFT PA1593 3 FIGURE 1 PROPELLER SHAFT ASSEMBLY 09002...
Page 256: ......
Page 268: ......
Page 295: ...SECTION 16 SUSPENSION PA1593 9 2 5 TORQUE SPECIFICATIONS...
Page 296: ...Section 16 SUSPENSION PA1593 10...
Page 297: ...Section 16 SUSPENSION PA1593 11...
Page 314: ......
Page 380: ......
Page 388: ......
Page 413: ...Section 22 HEATING AND AIR CONDITIONING PA1593 15 FIGURE 18 REFRIGERANT CIRCUIT CENTRAL SYSTEM...
Page 433: ...Section 22 HEATING AND AIR CONDITIONING PA1593 35 FIGURE 36 CENTRAL HEATING SYSTEM COMPONENTS...