Section 18: BODY
PA1593
5
2. VEHICLE
STRUCTURE
The body of the X3-45 coaches is an integral
structure made of 14, 16 and 18 gauge welded
and braced high tensile steel and stainless steel
members. All stainless exterior panels are glued
to anti-corrosion coated members. The complete
structure is protected against corrosion prior to
assembly. The front and rear caps are made of
molded fiberglass. The main roof is made of
high tensile aluminum panels riveted to the roof
structure. The floor is made of 2 layers of ½" (13
mm) thick plywood separated by a 1/8" (3 mm)
insulation to reduce power train and road
noises.
Welding
Since welding is a procedure that may be
carried out either as specific instructions from
Prévost or by an independent decision of the
owner, the following information pertaining to
welding should be read before beginning any
welding procedure. The prohibitions and
requirements outlined below must be followed
during welding procedure:
1. Welding must be done only by a qualified
and experienced person.
2. Adequate ground contacts and shields must
be positioned as required to protect compo-
nents from damage due to heat, contact by
weld splatter, arcing, or other potentially
damaging events associated with welding.
3. The following precautions are to be taken to
protect the electronic control components.
Refer to section 00, paragraph 3:
“PRECAUTIONS TO BE OBSERVED
BEFORE WELDING” in this manual.
4. Always wear the appropriate safety
equipment.
5. Weld in clean and well ventilated area, and
always have an appropriate fire extinguisher
within your reach.
3.
VEHICLE EXTERIOR MAINTENANCE
Regular washing to remove dust and dirt is
recommended. See
"Operator's Manual"
for
more details on washing and cleaning your
vehicle.
3.1 CORROSION
PREVENTION
Preventive maintenance is a key factor in
avoiding corrosion and must be considered as
part of the regular service intervals. The entire
underside of the vehicle is sprayed with a heavy
application of asphalt base undercoating.
The operating environment the vehicle is
subjected to will largely influence the amount of
dirt and corrosion that will accumulate over a
given period. Corrosion is one of the most costly
factors of part failure and shortened part life. It
is, however, an item that can be controlled when
it is conscientiously looked after and the proper
steps are taken in a timely manner.
Certain areas of the coach are more vulnerable
to corrosion than others, and it is these areas
that should be addressed. For example, the rear
baggage compartment bulkhead in the rear
wheelhousing area contains many key
components and should be examined regularly
for corrosion. Other areas include the front
wheelhousing area and the engine compart-
ment.
Road splash will affect undercarriage,
condenser coil and engine compartment. These
areas must be thoroughly cleaned to remove dirt
accumulations from flanges, channels and
ledges. These places accumulate dirt and salt
and hold it in direct contact with steel and
aluminum surfaces. Use an understructure high
pressure spray as part of a regular wash.
Damaged undercoating or paint should be
promptly repaired before corrosion can start.
Frequency of wash periods depends on
operating conditions. During periods of exposure
to salt, daily washing as described above is
recommended. If underbody parts show
evidence of rust or corrosion, treat as follows:
1. Remove dirt, grease and oil by solvent
washing.
2. Remove corrosion as well as all loose
coating by cleaning with a wire brush or
sandblasting.
CAUTION
Sandblasting can be used for cleaning
bulkheads, brackets and other structural
members. It should not be used for exterior
side paneling. Extreme care should be taken
not to sandblast excessively.
3. Apply correct primer, paint and undercoating
after removing all corrosion to prevent
further damage.
Summary of Contents for X3-45 2016
Page 4: ......
Page 16: ...Section 00 GENERAL INFORMATION PA1593 12 FIGURE 12 METRIC US STANDARD CONVERSION TABLE 00005...
Page 17: ...Section 00 GENERAL INFORMATION 13 PA1593 FIGURE 13 CONVERSION CHART 00006...
Page 18: ......
Page 26: ......
Page 58: ......
Page 72: ...Section 04 EXHAUST AND AFTERTREATMENT SYSTEM PA1593 14 7 TORQUE SPECIFICATIONS...
Page 73: ...SECTION 04 EXHAUST AND AFTERTREATMENT SYSTEM PA1593 15...
Page 74: ...Section 04 EXHAUST AND AFTERTREATMENT SYSTEM PA1593 16...
Page 76: ......
Page 96: ......
Page 134: ......
Page 176: ...SECTION 06B ELECTRICAL 38 overcurrent working Circuit 306 shorted to ground...
Page 180: ......
Page 202: ......
Page 205: ...Section 09 PROPELLER SHAFT PA1593 3 FIGURE 1 PROPELLER SHAFT ASSEMBLY 09002...
Page 256: ......
Page 268: ......
Page 295: ...SECTION 16 SUSPENSION PA1593 9 2 5 TORQUE SPECIFICATIONS...
Page 296: ...Section 16 SUSPENSION PA1593 10...
Page 297: ...Section 16 SUSPENSION PA1593 11...
Page 314: ......
Page 380: ......
Page 388: ......
Page 413: ...Section 22 HEATING AND AIR CONDITIONING PA1593 15 FIGURE 18 REFRIGERANT CIRCUIT CENTRAL SYSTEM...
Page 433: ...Section 22 HEATING AND AIR CONDITIONING PA1593 35 FIGURE 36 CENTRAL HEATING SYSTEM COMPONENTS...