XTR-PX2-C0006-IN004
3-2
3.1 Setting up the PILLAR
<Checking the anchors>
Check that the anchors (x4) are buried into the floor properly.
<Fixing the PILLAR (to the floor)>
Fix the PILLAR with CP10X40-CM1 (x4) (Screw bag S).
(Tightening torque : 25 N
・
m)
<Disposing the protection sheet>
To protect the base of the PILLAR from being scratched during installation, place the protection sheet.
Protection sheet
CP10X40-CM
1