XTR-PX2-C0006-IN004 Stand
5
3. building up
3-1. attach the Grip on the STAND BASE
3-2. Attach Adjusters on the STAND BASE
3-3. Confirm and adjust the horizontal levelness
3-4. covering the STAND BASE
The surface paint coating on the STAND BASE is very fragile. Not to damage the surface during the
installation work, cover the STAND BASE plate with protection material ( by pieces of cardboard box, or
cushion material or blanket )
Remove the upper layer package.
attach the Grip on the STAND BASE
(
4 locations )
Take out the STAND BASE,
Attach the ADJUSTER by hand
(
6 locations
)
Note: This process is done in the factory.
Among 6 adjusters,
adjust left and right levelness by two wall side Adjusters,
and adjust front and back levelness by two middle Adjusters.
Two front Adjusters just support the machine and we don't use
them as levelness adjuster.
BASE FRAME is not installed
yet in this situation.
wall side two Adjusters
for left and right levelness
middle two Adjusters
for front back levelness
front two Adjusters
just to support the body