straight connector for horizontally or vertically oriented track
two-tier connectors
T-Bar support connector
Follow all local and national electrical codes.
For assistance please call Prima Customer Ser
vice at 562-407-3079
IMPORTANT Please read these instructions prior to installation. Refer to the Prima catalog for proper lamp type and maximum wattage for fixtures.
Prima is not responsible for any fixture or system failure caused by unsupported lamps. Contact Prima customer service for the latest updates on
which lamps we support and proper usage. Prima low voltage transformers must be used with all Prima Lighting product installations. All warranties
are void if Prima transformers are not used. Prima’s catalogs provide general information and suggestions for proper dimmer usage. Please consult
our customer service department with any questions regarding dimmer specifics. Prima is not responsible for any damage caused by improper
dimmer specification and usage. Use only qualified electrician for installation. Adhere to all local and national electrical codes prior to installation.
It is strongly recommended that gloves are used when handling the FIT I System track. Oils and dirt from fingers can sometimes permanently
mark the finish. Track should be cleaned with a damp cloth and thoroughly dried before fixture installation. Connectors are available for
extending track length, turning corners or creating intersections in the run. Great care must be taken to ensure the connector is installed
properly.
J
The Straight Inline connector for horizontal or vertical orientations has the benefit of being virtually undetectable after installation. This
connector does not add any length to the over all track run. Insert the conductive (22-79232) or non-conductive (22-79233) inserts into the
conductor hole on one of the track lengths. Insert the top and bottom cover half way into the same track length and secure by tightening the set
screws with a flat head screwdriver. Connect the second track length and secure by again tightening the set screws with a flat head screw driver.
There should be no space between the connected track lengths after installation is complete.
K
Two tier connectors are for attaching two track length together in a perpendicular formation, one on top of the other. There are two types
of two-tier connector, one which conducts the power circuit (22-79302 conductive) and one which does not (22-79301 non-conductive). Both
connectors install in the same way.
Insert the connector into the two track slots
Rotate the knurled knobs on the connector 90º
each to lock into the track slots.
L
Prima’s T-Bar support connector allows you to connect a cable or stem support point to a standard T-Bar ceiling structure. The clip simply
twists onto the T-Bar and locks into place. Cable and stem support hardware is sold separately.
90º
90º
Available for stem or cable
support hardware (sold separately)
T-Bar clip lock onto T-Bar ceiling support.
13615 Marquardt Ave. Santa Fe Springs, CA 90670
Ph. 562-407-3079 . Fx. 562-407-3069
www.primalighting.com
REV
.033015
prima fit I system
general installation instructions part 7 of 12