11
L. F.
1/24/2013
17. The key must be turned to the 3 O'clock position as the knob slides over the
Project Complete.
shank, back into place. Press down the spring-loaded lock clip if necessary.
~ Remount Knob onto Shank ~
16. Align the slotted opening on the knob in direction of the spring-loaded lock
clip on the shank, then rest it on the tip of the shank to prepare the key and
cylinder position.
Summary of Contents for E-2402
Page 4: ...1 L F 1 24 2013 E 2402 ...
Page 15: ...L F 1 24 2013 E 2402 ...