Concrete engineering
Assembly instruction
®
Press on the Light-box.
You can drill different and individual
openings.
You can install the lamps.
Nail the Light-box on the formwork.
Mark the lamps with a line, because of
the O 195mm mineral fiberboard it‘s
easy to correct the differences.
Grout the ceiling.
2
2
2
1
1
1
Installation in cast-in-place concrete
Last part of the installation
Insert the steel strutting and ready to
concrete.
Remove the magnet.
3
3
Telefon
+49 8638 / 88 55 92 00
Telefax
+49 8638 / 88 55 92 99
info@primo-gmbh.com
www.primo-gmbh.com
Primo GmbH
Gebrüder-Dickow-Str. 2
84478 Waldkraiburg
Stand 03/2017
Halogen free
650 °C
H
Product clip at:
www.primo-gmbh.com
Order-no.
Name
VPE
P713
Light-box XL190 without tunnel
12
P713M
Light-box XL190 without tunnel, with magnetic attachment
12
P714
Light-box XL190 with tunnel
8
P714M
Light-box XL190 with tunnel and magnetic attachment
8
P713B
Light-box XL190 pre-installed, big pack
144
P714B
Light-box XL190 pre-installed with tunnel, big pack
144
P733
Magnet 32 mm to fix on the formwork
10