background image

5

*

Attention !

-

Any thermal intervention or welding  to the boiler No 1, without being advised by

the manufacturer, is

strictly forbidden.

(In that case, the manufacturer does not have any responsibility).

- Any  modification  to  the  technical  specifications  of  the machine(electrical  or

mechani- cal) is

strictly forbidden

to the third persons.

(In that case the manufacturer does not have any responsibility).

Fill the feedwater tank of 25lt(No 01) with clear water, using preferably  soft water

(up to 8 dh hardness).Turn on the main switch(No 02).Press the button No 03 .The

water pump starts to feed water into the boiler and the lamp No 04 is on. The  steam

lamp  No  05  will  be  lighted after  a  while.During  operation  the  boiler  refills

automatically.

Within a few seconds the boiler starts heating the water in order to supply steam in

about 15-20 min. The manometer(No 06) should reach 3,5 bars. The machine is ready

to work.Press the irons button(s)(No 07 ), only one button if the requested produced

steam is for 1 steam iron, or both buttons if the requested produced steam is for 2

steam irons.(That depends on whether you have Ecovapor for steam supply for one

or two  irons). Adjust  the  temperature  of  the  iron  using  the  thermostat  knob,

according to the fabric requirements. Adjust the steam quantity by the adjustor knob

(No 08 )  ac- cording to the fabric requirements. You can start ironing!

Operating instructions

Summary of Contents for Ecovapor 1-2,5

Page 1: ...IRONING PRESSING MACHINERIES FUSING PRESSES 14 Instruction Manual ECOVAPOR...

Page 2: ...2...

Page 3: ...01 103 06 002 103 06 007 For all 5 models Normal working pressure 3 5 bars Max working pressure 4 2 bars Admissible design pressure 6 2 bars Steam temperature 3 5bars 149 oC Electric connections Neutr...

Page 4: ...ater requirements Hardness less than 100mg las CaCO or less than 6 German degrees PH 7 8 CO No free CO allowed TDS less than 200mg l Fe None Suspended solids Water should be clear and free from suspen...

Page 5: ...e boiler and the lamp No 04 is on The steam lamp No 05 will be lighted after a while During operation the boiler refills automatically Within a few seconds the boiler starts heating the water in order...

Page 6: ...the boiler WARNING To avoid any burning accident follow carefully the instructions below Fill the condensate vessel C sketched below by water at a level of 5 cm approxima tely Screw tightly cap D Unlo...

Page 7: ...machine which leads to the pump Check if the pump is clogged The water is not heated while the steam lamp lights on Check the fuse 1Amber which is used for the heating on the electronic circuit card...

Page 8: ...eplace the pressure switch No 15 Technical Assistance For any advice about the operation of the machine or the spare parts please contact our agents in your territory or directly us Adress 14th kms Na...

Page 9: ...9...

Page 10: ...edwater tank s lid 19 303 03 057 Corner 1 2 Female Female 20 193 06 020 Condensate s pipe 21 303 03 002 Water pump 0 5HP PkM60 303 06 002 2 Water pump 0 7HP PKM65 for model 4 5bar 22 193 06 022 Boiler...

Page 11: ...e of safety valve 1 2 BETA 43 300 00 119 Contraction 1 x 1 2 Male Female 44 303 03 023 Nipple 1 2 X 12 45 303 03 027 Corner 1 2 Male Female of blow down valve 46 193 06 046 Water feed tank s base 47 3...

Page 12: ...12...

Page 13: ...13...

Page 14: ...03 03 021 Socket plug for iron No 2 E V1 303 03 018 Solenoid water valve 3 8 9313 E V2 303 03 010 Solenoid steam valve No 1 E V3 303 03 010 Solenoid steam valve No 2 PM 303 03 002 Water pump 0 5HP PkM...

Page 15: ...15...

Reviews: