background image

Printed in USA 4/06 © 2006

2

625-525revG-EN

Steamer
625-OS

Safety Information

Indicates information important to the proper operation of the 
unit. Failure to observe may result in damage to the equipment 
and/or severe bodily injury or death. 

Indicates information important to the operation of the unit. Failure to 
observe may result in damage to the equipment.

WARNING

CAUTION

Important

Prince Castle reserves the right to change specifications and 
product design without notice. Such revisions do not entitle the 
buyer to corresponding changes, improvements, additions or 
replacements for previously purchased equipment.

Installation

Remove the unit from the carton and inspect for signs of damage. If there 
is damage to the unit:

notify the carrier within 24 hours of delivery

save carton and packaging materials for inspection purposes

contact your local dealer, or if purchased directly, the Prince Castle 
Sales Department at 800-722-7853 or 1-630-462-8800 to arrange for a 
replacement unit.

Regulator Assembly (625-276S) is packed separately in the box. The 
regulator is designed to be attached to the back of the prep cell.

NOTE: When installing this unit, the ambient temperature at the mounting 
site should not exceed 37.8°C (100°F).

All electrical connections must be in accordance with local electrical codes 
and any other applicable codes.

Plug the unit into an applicable electrical receptacle. Connect the water 
line to the back of the unit.

Water connection must provide maximum water pressure of 20 – 30 psi 
(138 – 207 kPa).

CAUTION

CAUTION

Operation

A.  Turn unit power On/Off switch to ON position. The display 

flashes all segments for 3 seconds. Then display will show 

PRINCE CASTLE

 for seven seconds.

B.  After ten seconds the display will show 

PR.E-HEAT

.

1

NOTE: The next-to-left most decimal point appears indicating power is 
applied to the platen. Platen will heat to the setpoint temperature.

Place the spatula fully into the unit and press the START button.

A beep will sound and the display will start to count down the 
steam cycle.

3

A. When the unit reaches the setpoint temperature, display will 

show the product name assigned to button 4.

B.  Pull out the spatula and place meat preset on the spatula 

insert.

2

When steam cycle is complete, the unit will sound a tone and 
the display will flash 

REMOVE

Pull out the spatula and remove the finished product.

4

Summary of Contents for 625-OS

Page 1: ...n location service i e trip charges and or mileage Travel mileage is limited to 100 miles 200 kilometers round trip one trip warranty from an authorized service agency or its sub service agency This warranty is subject to the following exceptions conditions Use of any non genuine Prince Castle parts voids this warranty All labor shall be performed during regular work hours Overtime premium will be...

Page 2: ...ed to be attached to the back of the prep cell NOTE When installing this unit the ambient temperature at the mounting site should not exceed 37 8 C 100 F All electrical connections must be in accordance with local electrical codes and any other applicable codes Plug the unit into an applicable electrical receptacle Connect the water line to the back of the unit Water connection must provide maximu...

Page 3: ...hows the current calibration temperature C Press the PRODUCT 2 button to zero any previous calibration offset value The display will now show the platen temperature without any calibration offset Factory Presets Loading factory presets restores the unit to factory settings and voids all user programmed information A During power up press and hold both PRODUCT 1 and PRODUCT 4 buttons within 3 secon...

Page 4: ...ter D Press the RAPID STEAMER Logo button to store the new product name 4 NOTE Pressing the PRODUCT 3 button at any time exits the Program Mode without storing the change A Press the UP or DOWN Arrow button to change the valve ON time B Press the RAPID STEAMER Logo button to store the new valve ON time 6 NOTE Pressing the PRODUCT 3 button at any time exits the Program Mode without storing the chan...

Page 5: ...B Press the RAPID STEAMER Logo button to store the desired temperature 12 NOTE Pressing the PRODUCT 3 button at any time exits the Program Mode without storing the change Factory Pre Set Temperatures Factory pre set temperatures Sandwich 176 C 350 F Filet 176 C 350 F Large 176 C 350 F PROD1 11 176 C 350 F The display now shows the product s number of on off water valve cycles 9 The display now sho...

Page 6: ...sert see Figure A the steamer regulator water pressure should be set at 30 psi Figure A Spatula Spatula Insert Venturi Plate for Spatula with Insert When using a one piece spatula see Figure B the steamer regulator water pressure should be set at 40 psi Figure B One Piece Spatula Venturi Plate for One Piece Spatula ...

Page 7: ...6 seconds B Release both buttons Press the RAPID STEAMER Logo button 2 NOTE Pressing the PRODUCT 3 button at any time exits the Program Mode without storing the change A Press the UP or DOWN Arrow button to change the valve ON time B Press the RAPID STEAMER Logo button to store the new valve ON time 4 NOTE Pressing the PRODUCT 3 button at any time exits the Program Mode without storing the change ...

Page 8: ...N Arrow button to scroll to the desired time delay B Press the RAPID STEAMER Logo button to store the desired time and to exit the Program Mode 11 NOTE Pressing the PRODUCT 3 button at any time exits the Program Mode without storing the change Platen temperature can be set between 129 176 C 265 350 F A Press the UP or DOWN Arrow button to scroll to the desired temperature B Press the RAPID STEAMER...

Page 9: ...wel Protective insulated gloves Steamer brush 16 oz 437 ml cup A Remove spatula with insert B Remove the top plate by carefully sliding it forward and out of the unit C Remove the venturi plate While wearing protective gloves 2 Top Plate Venturi Plate Spatula Spatula Insert OPTIONAL If the surface shows signs of excessive calcium and lime buildup dissolve two teaspoons 10 ml of McD Delimer in a sm...

Page 10: ... 12 625 319S Water Valve Assembly 13 625 318S Water Valve Connector Kit 14 65 059S Relay 15 625 323S Power PC Board 16 625 337 Venturi Plate 17 625 082S Probe 1000 ohm RTD 18 See Below Line Cord Assembly 19 625 187S Spatula Insert 20 625 276S Regulator Assembly Kit 21 625 097S Spatula Handle Kit 625 275S Display PCB 625 293S Display PCB 625 OSA16 86 365S Strainer Cap Kit Line Cord Versions 72 386S...

Page 11: ... 14 1 35 8 13 15 9 MODEL VOLTS Hz WATTS AMPS PLUG NUMBER 625 MCD 625 OSW 208 240 50 60 3450 15 0 IEC 309 625 MFY 625 OS 220 50 60 3150 14 3 3 Pin 30 amp Hubbel 625 MCDA 625 OSA Australia 230 50 60 3450 15 0 Marechal DS3 Series 32 amp 625 MCDA16 625 OSA16 Australia 230 50 60 3450 15 0 Marechal FH111 Series 16 amp Designs and specifications are subject to change without notice SANITATION CLASSIFIED ...

Page 12: ...ter pressure too high Adjust water pressure See page 6 Water ON cycle too long Check for proper programming of Sandwich steam cycles Decrease ON time until desired results are reached Too many water cycles Check for proper programming of Sandwich steam cycles Decrease number of CYCLES until desired results are reached Not enough moisture Water pressure too low Adjust water pressure See page 6 Plat...

Page 13: ...625 525revG EN 13 Printed in USA 4 06 2006 Steamer 625 OS Wiring Diagram ...

Page 14: ...Printed in USA 4 06 2006 14 625 525revG EN Steamer 625 OS Notes ...

Page 15: ...rning off the unit prepare the deliming solution Add one packet of McD Delimer to 16 ounces 437 ml of warm water To ensure that all of the delimer dissolves stir solution vigorously Remove top cover venture plate spatula and top plate These pieces are hot Pour the delimer into the steam chamber WARNING 1 Let solution soak on the platen for five minutes While deliming the platen dampen the bristles...

Page 16: ...d of valve 2 Using pliers gently pull the tube out from the platen You may need to softly rock it back and forth Replace the black insulating bushing if the original bushing pulled out with the water tube All units must have a bushing installed To reinstall the bushing lubricate it with water and push it back into the opening Platen must be cool CAUTION 3 To insert the new tube first insert the to...

Page 17: ...ile wearing protective gloves remove the top cover top cover plate and venturi plate and wash in a solution of McD APSC APC made up in the back sink Rinse with clean water sanitize with McD Sink Pak Sanitizer KAYQUAT and air dry NOTE Do not use abrasive materials to clean the spatula insert or spatula 3 Wipe the steam chamber surface with a clean sanitized towel 4 If the surface shows signs of exc...

Page 18: ...kets can be used Two teaspoons of McD Delimer can be dissolved in a small coffee cup with hot water The packet can be used for 4 applications However it is not recommended to leave open packets lying around 4 Let the delimer solution soak for at least 15 minutes Delimer is more efficient when the unit is hot 5 With the delimer in the steam chamber clean the water tube Dip a steamer brush in the de...

Reviews: