background image

INSTALLATION

1.

After you have removed the toaster from the carton,
inspect the unit for signs of damage. If there is
damage to the unit:

l

Notify carrier within 24 hours after delivery.

l

Save carton and packing material for inspection
purposes.

l

Contact the Prince Castle Customer Sales
Department at 1-800-722-7853 to arrange for a
replacement to be sent.

2.

Verify that all parts have been received.

l

Slim-Line Bun Toaster and conveyor assembly.

l

Line Cord–packed separately from the toaster
and is located at the bottom of the box.

l

Release Sheets–located in a 14” box.

l

Crumb Tray–taped to the front of the conveyor.

3.

Place toaster on flat surface.

4.

Lift conveyor off conveyor guide rails and set aside.
Remove all packing materials (nylon tape, foam block
and black rubber packaging spacers) from conveyor
and conveyor guides.  See figure 1.

5.

Attach conveyor to the toaster by sliding the four pins
(conveyor slides) on the conveyor housing into the
four conveyor guides.  Lower the conveyor housing
until it is securely in place. See figure 2.

6.

Connect line cord and plug unit into a 230 volt
grounded receptacle.

OPERATION

1.

Place the release sheet over the top of the platen
housing, making sure to have three inches of over-
hang.  See figure 3.

2.

Slide the release sheet holding bracket onto the top of
the platen housing to securely hold the release sheet
in place.  Match the FRONT of the labeled bracket with
the front of the platen. See figure 3.

3.

Hook back end of crumb tray onto the bar located
below the conveyor assembly.

4.

Attach conveyor to the toaster.  See figure 2.

5.

Turn the heater switch to the “On” position.  The
orange indicator light will illuminate.  Allow 30 minutes
for platen to reach operating temperature. See figure 4.

6.

Turn the motor switch to the “On” position.  The
orange indicator light will illuminate.  See figure 4.
Conveyor chain will begin to rotate.

IMPORTANT:  To conserve energy when toaster is not in
use, turn the motor switch “Off”.

7.

Place a sample run of the product being toasted into
the top of the conveyor housing. The side to be
toasted should face the
platen. See figure 5.

8.

The toasted product
will be dispensed
automatically from the
bottom of the conveyor
assembly.  The
toasting cycle is
30-35 seconds on
model 197 and 15-18
seconds on model 297.

2

figure 3

Release
Sheet

Holding
Bracket

3-inch
Overhang

figure 5

Heel

Crown

figure 2

Conveyor
Guides

Conveyor
Guides

Heater
Switch

Motor
Switch

1

1

0

0

figure 4

Conveyor
Guides

Crumb
Tray

figure 1

Summary of Contents for Excalibur 197-FCE

Page 1: ...omer for parts or labor This warranty is subject to the following exceptions conditions l Service must be performed by an authorized Prince CastleServiceCenter l Any use of non genuine Prince Castle s...

Page 2: ...se sheet over the top of the platen housing making sure to have three inches of over hang See figure 3 2 Slide the release sheet holding bracket onto the top of the platen housing to securely hold the...

Page 3: ...kwise to compensate for use on thicker bread products Turn the two platen adjustment knobs counter clockwise for thinner products See figure 6 Platen Temperature The temperature of the platen can be a...

Page 4: ...MAINTENANCE MOTOR To extend the life of your replacement motor have an authorized factoryservice technician add 2 3 drops of 3 in 1 oil on a monthly basis Note See the drawing for oil wick hole locat...

Page 5: ...rable thermostat Replace thermostat Power rocker switch light on Inoperable platen Replace platen Unit heats up but the Loose motor switch connection Tighten motor switch connection conveyor does not...

Page 6: ...ight Side Shaft Carrier Adjustment Assy 4 197 457 Left Side Shaft Carrier Adjustment Assy 5 81 015 Compression Spring 6 197 467 Conveyor Slide 7 197 280 Shaft Assy 8 197 465 Driven Shaft 9 197 302 Spr...

Page 7: ...76 165 Set Screw 7 76 640 Screw 8 197 96 Left Side Bun Fence 9 73 008 Self Locking Hex Nut 73 030 Hex Nut 79 016 Flat Washer 76 033 Slotted Flat Head Screw 10 76 640 Screw 11 197 13 Lead Pan Weldemen...

Page 8: ...055 Flat Washer 7 76 040 Slotted Binder Head Screw 79 017 Split Lock Washer 73 030 Hex Nut 8 76 150 Slotted Pan Head Screw 79 094 Flat Washer 9 79 016 Flat Washer 76 095 Slotted Binder Head Screw 10...

Reviews: