4.5.2.2
Synchronization and Ethernet Wiring
Also refer to Section 4.13.4.2.
Table 6: Ethernet port wire requirements
Voltage Rating
600 Volts
Temperature Class
75°C or greater
Cable type
Standard 8 way Ethernet cable:
shielding recommended
4.6 Wiring Terminals
All cables enter and exit the enclosure from underneath the plinth in the left front of
the enclosure (see Figure 23). There are power cables for AC power wiring, DC
power wiring and signal wiring respectively. A view of the power terminals is shown
in Figure 22.
Figure 22: View of Terminal blocks for DC (PV/Battery) and AC power wiring.
Grid Port
Load Port
DC Port
(Battery/PV)
Earth Ground
Accessible through
Bottom Panel
Earth GND
Summary of Contents for GTIB-30
Page 1: ...Clean power made simple GTIB 30 Installation Manual ...
Page 2: ...www princetonpower com 4411 0011 Rev 2 0 April 1st 2014 ...
Page 11: ...About this Manual 4411 0011 Rev 2 0 xi This page intentionally left blank ...
Page 15: ...Contents 4411 0011 Rev 2 0 15 This page intentionally left blank ...
Page 16: ...1 Introduction ...
Page 18: ...2 System Overview and Configurations ...
Page 31: ...3 Pre Installation ...
Page 36: ...GTIB 30 Installation Manual UL 36 4411 0011 Rev 2 0 This page intentionally left blank ...
Page 37: ...4 Wiring Instructions ...
Page 56: ...GTIB 30 Installation Manual UL 56 4411 0011 Rev 2 0 This page intentionally left blank ...
Page 57: ...5 Commissioning Sequences ...
Page 61: ...GTIB 30 Installation Manual UL 4411 0011 Rev 2 0 61 This page intentionally left blank ...
Page 62: ...A GTIB 30 kW Specifications ...
Page 65: ...GTIB 30 Installation Manual UL 4411 0011 Rev 2 0 65 This page intentionally left blank ...
Page 66: ...B Return Material Authorization Contact and Product Information ...
Page 69: ...GTIB 30 Installation Manual UL 4411 0011 Rev 2 0 69 This page intentionally left blank ...