9.
Remove the jam nut from the orifice.
7. Place nut onto the new orifice and thread it until it will no longer turn.
8. Place pipe thread sealer onto the new orifice threads covering, be sure to cover the last three
threads well.
9. Place the heat shield over the control box outlet pipe and begin threading the orifice into
place. Tighten with a wrench until secure.
10. Once the orifice is tightened, there will be several threads left between the jam nut and the
heat shield. With the wrench, tighten the jam nut until the heat shield is firmly secured into
place.
Summary of Contents for Hardscapes Moderno 5
Page 20: ...Section 6 Wiring Layout Diagrams...
Page 23: ......