background image

9

To remove the solid waste after burning, a movable grate and an ash-pan is used. The ash-pan must be emptied even before it is filled with a purpose to avoid 
plugging up of the supplying feeding of the air under the grate. The ash is kept in nonburnable vessels with a cover.
When operation with the pellets is recommended at least once in every two days the customer to turn off temporarily the burner, to wait until the boiler has 
cooled to safe levels of temperature, to clean the internal heat exchanging surfaces of the accumulated ash, to clean the burner, to carry out the ashes, after 
which in reverse order to close the doors of the boiler and to turn the burner on.
After continuous operation ash and soot are accumulated on the walls of the boiler, especially on the heat exchanger and on the smoke pipes, whereupon the 
heat transfer is decreased and the boiler loses power. As a whole the quantity of the ash and the soot depends on the quality of the used fuel and the working 
conditions. If the boiler has insufficient power or it is operated at a low temperature, the amount of the soot in the process of burning increases considerably. In 
the same way the shortage of the draught in the chimney influences, as well. The surface of the water heat exchanger is cleaned by means of a steel brush.

A main rule in the operation: It is better a shorter burning at full power than continuous burning at low power. 

The characteristics of the operation of the pellet burner and the auger forfueling from the tank to the burner are given in its manual for installation and operation. 
After termination of the heating season, the boilerand the chimney are cleaned thoroughly. The steam-boiler room shall also be cleaned and be dry.
Do dot perform any unauthori

z

ed modifications in the design

!

During repairs only original spare parts by the producers shall be used.

The guarantee is not valid for fireplaces with bulging water jackets, which are a result of the increased pressure in the system beyond the

admissible one on incorrect installation.

It is recommended that the installation be done by a skilled specialist

Last update 10.05.2012

WARRANTY CARD

The products of PRITY are made in conformity with the requirements for safe operation and effectiveness according to: Bulgarian State Standard 

EN

 

13240:2006, BSS 

EN

 12815:2006, BSS 

EN

 13229:2006, BSS 

EN

 12809, BSS 

EN

 303-5 and correspond the approved technical documentation

The warranty period of the product is 36 (thirty six) months from the date of the sale from the trade network, provided all requirements for proper transportation, 
installation and operation are observed.

For the removal of defects, the fireplace is presented to the dealer, from whom it has been purchased, as its warranty card must be obligatorily

enclosed.

All claims are satisfied, except in the following cases, when:
- it refers to formation of condensation;
-  it refers to a broken glass pane or bricks;
- there is a return of flue gases (smoking);
- the requirements for installation and operation indicated in the present instructions and the installation instructions have not been observed;
- the defects have been caused during transportation;
- the fireplace has a bulging water jacket as a result of increased pressure beyond the admissible.

ATTENTION!

The warranty is valid only if this guarantee card is filled in and signed legibly in ink or a ball-point pen and stamped.

In accordance with Directive 99/44/EC of the European Parliament for sale of goods and associated guarantees, the seller shall be liable to the customer for

any

 

lack

 

of

 

conformity

 

of

 

goods

 

that

 

are

 

subject

 

of

 

the

 

sales

 

contract

.

The transportation expenses are at the expense of the customer.

Producer: "Prity 95" Ltd. Bulgaria, town of Liaskovets, M. Raycovichstr. 33

e-mail: prity95@yahoo.com, www.prity-bg.com

 

PACKING LIST FOR A BOILER FOR WOOD AND COAL

- body of the boiler;
- doors;
- a drawer- ash-pan;

-

 cast-iron grate;

- a set of handles;
- thermostat for the primary air;
- decorative side panels;
- technical

 

description, instllation and operation instructions

 

PACKING LIST FOR A COMBINED BOILER

- body of the boiler;
- doors;
- a drawer- ash-pan;

-

 cast-iron grate;

- a set of handles;
- thermostat for the primary air;
- decorative side panels;
- technical

 

description, instllation and operation instructions

The

 

fireplace

 

has been

 

delivered

 

in

 

a

 

good

 

working

 

condition

 

to

 

the

 

buyer

:

.....................................................................................................................

(Full name of the purchaser)

Adress:.........................................................................................................

Company name ...........................................................................................

City (town).....................................................................................................

Invoice No. ...................................... dated from ..........................................

PURCHASER .....................................  SELLER ......................................... 

    

(Signature and stamp)

(Signature)

(Date of the sale)

Summary of Contents for GA26 new line

Page 1: ...BG STANOVANJSKI GRELNI KOTLI NA TRDNA GORIVA str 23 PIECE WOLNOSTOJ CE NA PALIWA STA E str 26 KOTLE NA TUH PALIVA PRO DOM C POU IT str 29 APKURES CIET KURIN M KATLI l 35 ILDYMAS KIETOJO KURO KATILAI...

Page 2: ......

Page 3: ...Y 18 PRITY G 26 PRITY G 33 PRITY LB PRITY SLB 19 28 36 44 36 1 5 1 5 1 5 2 5 2 5 22 25 30 30 30 35 62 70 84 64 PRITY SLB 36 2 5 30 64 BG 9 MA 18 new line GA 26 new line GA 33 new line SLB new line LB...

Page 4: ...cm 80 cm 4 h m II x c x 1 c II x II 2 c III 1 2 120 3 4 5 6 7 8 9 10 11 1 2 3 4 5 12V 220V 50Hz 6 PRITY SLB PRITY LB I mm kW kW g 10 30 84 309 150 40 15 80 0 32 58 1 30 80 10 30 64 300 150 33 15 82 0...

Page 5: ...5 7 8 9 10 3 4 1 303 5 10 EN 20 2 5 15 1 20 10 10 2 3 0 9 IV 60 5 10...

Page 6: ...201 05 12 6 N 13240 2006 EN 12815 2006 EN 13229 2006 24 36 I 112 115 112 1 2 1 2 3 113 1 2 3 2 114 4 5 114 1 113 1 2 2 3 115 4 115 1 2 1 3 1 1 II 112 115 112 15 1 III 95 33 0898 258 801 www prity bg c...

Page 7: ...HOHPHQWV URVHWWH DQG FKLPQH PXVW EH IL HG WLJKWO DQG ILUPO VR WKDW WKH PD QRW JHW LQWR LQ WKH SDVVDJH VHFWLRQ RI WKH FKLPQH 7KH VPRNLQJ SLSHV VKDOO KDYH WKH VDPH VL H DV WKH FRQQHFWLQJ SLSH RI WKH ER...

Page 8: ...n with pellets the valve must be entirely open The adjusting of the primary air is done by a thermostat depending on the temperature of the water in the boiler The adjusting process is carried out by...

Page 9: ...12 WARRANTY CARD The products of PRITY are made in conformity with the requirements for safe operation and effectiveness according to Bulgarian State Standard EN 13240 2006 BSS EN 12815 2006 BSS EN 13...

Reviews: