•
Slide the second clamp (12) over top post lower section (9) then join onto the
middle post and secure with 3 M5x6 screws.
•
Ensure the upper clamp is fitted to the thinner section of upper post.
•
Fit the heater unit to the top of the upper post and secure by tightening the knob.
•
Clip the mains lead into the two clamps and adjust their position up and down to
hold the lead neatly and securely.
Clamp
Mains Lead
Clamp
Clamp
Lower Post
Screws
Heater
Mains Lead
5