31
Installation
En
g
lish
Removal procedure
NOTICE
BROKEN ENCLOSURE
• Attach correctly without a crevice between gaskets and between gasket and
the panel.
• Do not attach installation fastener in a different position from mounting
instruction.
• Do not exert more than 0.8 N•m (7.1 lb-in) of torque when tightening the
installation screws.
• For use on a flat surface of a Type 1 Enclosure
• Attach the Overlay correctly with the installation.
• Do not reuse the Overlay removed once.
Failure to follow these instructions can result in equipment damage.
Step
Procedure Details
1
Remove the nuts from the four stud bolts fixed in place on the rear
surface of the panel, and then slowly remove the GP unit from the
panel.
Removal diagram (profile)