7
STEP 3
1. Attach the Swing tube (24R) to the
vertical tube shaft of the vertical tube
(38) with Allen bolt (27), big washer (13).
Note: Don’t lock in order to attach the
pedal tube to crank easier.
2. Attach the pedal tube link (8) to the
crank (21) with Flat washer (45), Wave
washer (53) and Nylon nut (10). Do
not tighten them first.
3. Connect the Swing tube (24R) with
the Pedal support tube (16R) with Hex
bolt (23), Nylon nut (20).
Then tighten the Allen bolt (27),
Nylon nut (10) and Hex bolt (23). The
same way attach the left Swing tube
(24L) and left Pedal support tube link (8)
to the shaft of the Vertical tube (38) and
the crank (21). Finally, cover the Cap
S17 (11) to the Nylon nut (10) and cover
the Cap S14(26) to the Allen bolt (27).
4. Attach the Protective guard (22L/R) to the connecting of Swing tube (24L/R) and Pedal support tube (16).
with Cross tapping screw (42).
STEP 4
Attach the pedal (18L, 18R) to the
Pedal support tube (16) with Allen bolt
(19), flat washer (14) and nylon nut
(25).
Note: Pedal support tube (16) could
adjust the height (to and fro) of the
L/R pedal(42).You could adjust to the
proper height you want