27
OFT-3 User's Guide Rev A 2/7/14
Chapter 8 Project Management
8.1 Project Management Description
Project Management allows the user to save a set of parameters to be recalled for use at a later time. It also
incorporates the file management system to save traces to the active project folder. When the OTDR is turned
on, the default project is [NONE]. If an existing project is not open or a new one not set, all traces will be saved
to the [NONE] folder.
Fig 8.1
Project Folder
List
Project
Details/Properties
Project Management File Menu
The file menu for project management may be operated with the touch screen, however, this manual describes
the manner of operation with the keypad. To open the file menu press the menu button. Press select to drop
the file drop down menu or the left or right buttons to move in through the file menu.
Fig 8.2
Project Management Screen
Touch Screen Tip
The file menu may be pulled down with the stylus the same as the menu on the main trace screen. Once the file
menu is open, it is fully operable with the touch screen function.