Operation
18 / 21
6.
Operation
This chapter provides information about the operation of the machine. This chapter is intended
for the operator and the maintainer of the machine.
6.1.
Placement and movement
No special transport equipment is required.
The machine is equipped with forklift tubes and a lifting eye. This makes it simple to move the
machine with a forklift or construction crane.
Make sure that the machine is horizontal and stable during use
6.2.
Operation in general
The following is a description of regular operation. Comply with the safety regulations in
chapter 3. Operation is carried out using the controls and adjustments described in section 4.2.
For additional information also see section 4.6. Clean stone debris from the machine regularly.
6.3.
Start up
Connect the machine to the mains supply. See also section 5.3. After connection to the
mains, the machine is ready for use.
Move the stone into the approximate position.
Use the handle to adjust the upper blade to the correct height above the stone. The
space between the upper blade and the stone must be 0 to 5 mm.
Slide the stone into the correct position, approximately in the middle of the blade. See
also the pictogram shown on the machine, Figure 6.3-1.
Figure 6.3-1: Pictogram "Stone in the middle of the blade"
Push the push button to move the lower blade upward. BE CAREFUL! Keep body parts
out of the area between the stone and the blade! When the push button is released, the
lower blade returns to its original position.
Release the push button when the stone has been cut into two pieces. The lower blade
returns to its original position.
6.4.
Shut down
The machine can be shut down by removing the plug from the mains connection.
Summary of Contents for AL-90
Page 3: ......
Page 29: ......
Page 30: ...51200054 V1 GB Opreration Instructions Hydraulic block cutter Typ AL 90 NSH 40 ...