Operating Instructions
Installation
19 / 34
V4
GB
4.3
Electrical Installation
•
The electrical installation and connection of the device to the power supply may only be carried out by
qualified personnel.
4.4
Initiation
The device must be installed and maintained by qualified personnel, mechanics and electricians.
4.5
Mounting the suction pad to the lifting device
Support
Socket pin
Projection
Suction pad
Lifting device
•
Suspend the lifting device from the suspension eye bolt on the crane or hoist used. Secure it safely!
Take the weight of the lifting device and the maximum carrying capacity into consideration!
•
Insert the suction pad into the support of the lifting device.
•
Feed the socket pin into the boring until the projection of the socket pin is at the shoulder of the suction
pad. Turn the socket pin downward until the projection is secure under the support. Check whether the
socket pin firmly secured. The socket pin must not be able to be pulled out without turning.
•
Connect the vacuum hose to the suction pad and lock it with the integrated lock nut.
•
Before lifting loads check the safety equipment as described in section 1.12.