ComBricks User Manual v6.4.0 | January 18| © PROCENTEC
21/219
2
Quick start
2.1
Quick start checklist
This checklist lists all the steps to a quick usage of ComBricks.
STEP 1:
Provide the Head Station with the latest firmware.
(7)
STEP 2:
Prepare the backplane with the amount of required backplane units.
STEP 3:
Click the assembled backplane on the DIN-rail.
STEP 4:
Insert the Head Station in the most left slot.
STEP 5:
Insert the other modules in the remaining slots.
STEP 6:
Configure the repeater modules to their appropriate networks.
STEP 7:
Wire the repeater modules with PROFIBUS cables.
(2.5)
STEP 8:
Power the Head Station.
(2.6)
ComBricks units with Head Stations type 1A are now operational and no further steps have to be
taken. For type 1B and 1C Head Stations proceed with the next steps.
STEP 9:
Insert an Ethernet cable in the Head Station.
STEP 10:
Set the IP address to the required value.
(2.7 + 2.8)
ComBricks units with Head Stations type 1B and 1C are now operational, ProfiTrace OE is
autonomously logging PROFIBUS events. After these basic steps ComBricks can be further configured
through the web server.
STEP 11:
Checking the modules and administrative info in the web server.
(2.9)
STEP 12:
Testing ProfiTrace OE on the PROFIBUS installation.
(2.10)
Summary of Contents for ComBricks
Page 1: ...User Manual ...
Page 132: ...ComBricks User Manual v6 4 0 January 18 PROCENTEC 132 219 ...
Page 213: ...ComBricks User Manual v6 4 0 January 18 PROCENTEC 213 219 44 Certificates ...
Page 214: ...ComBricks User Manual v6 4 0 January 18 PROCENTEC 214 219 ...
Page 215: ...ComBricks User Manual v6 4 0 January 18 PROCENTEC 215 219 ...
Page 216: ...ComBricks User Manual v6 4 0 January 18 PROCENTEC 216 219 ...
Page 217: ...ComBricks User Manual v6 4 0 January 18 PROCENTEC 217 219 45 Notes ...
Page 218: ...ComBricks User Manual v6 4 0 January 18 PROCENTEC 218 219 ...