Jetzt Angebot anfordern auf www.poolseller.de
»
NOTICE DE MONTAGE
/ OCTO & OCTO +
50
>>
ASSEMBLY THE OCTO + POOL STRUCTURE
The pool structure is mounted in two stages:
-Stage 1, excavation of the site and installation of the cradles designed to reinforce the lateral walls. A cradle
comprises a cross beam, vertical posts and metallic plates to be bolted together.
-Stage 2, assembly of the wooden structure and fitting of the additional items (liner, coping, etc.).
We recommend that the pool structure be assembled by two people.
Before you begin, familiarise yourself with the nomenclature page (enclosed with the Waterproofing kit) and the
main exploded view (at the end of this document) that corresponds to your pool.
You will need to dig shallow trenches to hold the cradles. Make sure that these are parallel to each other and to the A2
axle. The number of trenches required will depend on the pool model, refer to the illustrations corresponding to your
pool. Trenches should be regular and sized to hold the cradles in the right position.
Lay the cradle components out beside the trench and fit them together (using the cradle kit).
Once the cradles have been assembled, place them in the trenches and block them in position using wet compacted
sand if necessary. During this operation, check that the cradles are level, straight, aligned and parallel. Fill the
trenches with wet, compacted sand. Important ! Make sure that the cradles are buried to the correct depth.
21
22
23
24
25
26
»
INSTALLATION INSTRUCTIONS
/ OCTO & OCTO +
Jetzt Angebot anfordern auf www.poolseller.de